PS3D said:
Captn_Ag05 said:
I am confused as to why you think it has been some long period of time without any announcement. The property went on the market in the fall of 2022. We are in January of 2023. The gas station on the land has already been cleared. It usually takes months if not years to develop plans, announce them, start construction, etc. There is nothing about the timing so far that would make me think there is some significant roadblock preventing development. I don't think it has even been long enough to hit a roadblock.
The Rise, Aspire, and whatever's replacing the Lutheran Center were announced before their respective previous buildings were demolished and construction began immediately, as well as the Lutheran center on College Main. If there was a real plan, the gas station would've operated until everything was signed off on.
Was the gas station even operating before it was listed?
Big difference between all the other sites you mentioned and a gas station is you first have to deal with removing the underground tanks, testing the soil, remediating any leaks, and getting all that environmental stuff approved first.