I sourced the interlock, breaker, conduit, wire and power inlet box. I got the conduit in place, power inlet mounted and pulled the wire. I paid $200 to "commission", he had to move breakers, and put in the new one, terminated the wires, and put on/installed the interlock. I thought this was fair.