the coal plant was torn down. The other one is east of there by Roans Prairie.
Hammerheadjim said:
Will this facility use reservoir water and the 2 coal plants on site? I believe the infrastructure is still there.
Shouldn't any excess electricity go back to the grid? If so, this will be a win-win. Even better when modular nuclear is readily available.
flyguysr5 said:
Need to update your timeline schedule. Flew over the site Sunday and the heavy earth moving equipment is already there with 200 plus acres are already cleared somewhat leveled with work continuing. If I knew how to post the video I would. Interesting is it is on the south east side of the lake accessed from Hwy 30 not at the old plant location and accessed from 244 and 171 as I expected.
benchmark said:flyguysr5 said:
Need to update your timeline schedule. Flew over the site Sunday and the heavy earth moving equipment is already there with 200 plus acres are already cleared somewhat leveled with work continuing. If I knew how to post the video I would. Interesting is it is on the south east side of the lake accessed from Hwy 30 not at the old plant location and accessed from 244 and 171 as I expected.
Interesting. Maybe a few mo's ahead of what we thought? Another obvious and telltale milestone will be Terafab's TCEQ batch plant application(s). The concrete needed will be massive - Samsung Taylor needed 5 batch plants and the steel/ aggregate delivered by rail. The Gibbons RR spur will probably be used similarly.
On that note and probably unrelated, Knife River applied for a TCEQ concrete batch plant in Carlos last week. Probably for the SH-30 4-lane bridge expansion project.
EBrazosAg said:
And why would they put a batch plant in Carlos for a bridge project 8 mi away? Lots of places to put one closer.
rockportred said:
Judging off speed of the Tesla Austin plant being done, Elon really does not eff around on these things.
EBrazosAg said:
The Hwy 30 contract isn't getting a final decision on bid till November according to what TxDOT told the land man handling ROW. That wouldn't lead to a batch plant now either. Just another reason I doubt that is what it's for.
EBrazosAg said:
Interesting tonight- KBTX confirms that the water rights to pump from the Navasota to Gibbons Creek did not survive the TMPA power plant demise. I had always figured they didn't as the purpose for those rights- power plant cooling- had ended. Will be interesting to see if the new owners apply for new rights- or maybe they think it's not needed. I'm kinda surprised the Grimes Co group hadn't keyed in on it earlier. Assuming there is a plan to apply for Navasota water rights to the Brazos River Authority- otherwise why buy the pipeline, pump station and ROW?
flyguysr5 said:
Need to update your timeline schedule. Flew over the site Sunday and the heavy earth moving equipment is already there with 200 plus acres are already cleared somewhat leveled with work continuing. If I knew how to post the video I would. Interesting is it is on the south east side of the lake accessed from Hwy 30 not at the old plant location and accessed from 244 and 171 as I expected.
Tailgate88 said:flyguysr5 said:
Need to update your timeline schedule. Flew over the site Sunday and the heavy earth moving equipment is already there with 200 plus acres are already cleared somewhat leveled with work continuing. If I knew how to post the video I would. Interesting is it is on the south east side of the lake accessed from Hwy 30 not at the old plant location and accessed from 244 and 171 as I expected.
Big shout out to flyguysr5 for the video!
SCHTICK00 said:
Batch plants will be erected onsite and materials brought in by rail. The amount of concrete needed is enormous and the cost of trucking to bring in aggregate by truck from Maysfield is high especially with a spur onsite.
AggiePhil said:
Where is the spur to the Gibbons Creek site? Not seeing it on the map but I'm sure it's there somewhere.
UmustBKidding said:
Yup no rail spur there anymore. I removed all the signal equipment and track crew came in and dismantled it awhile back.
Assuming the right-of-way (ROW) is still legal and groundwork is prepped, installing 8 miles of new rail infrastructure should cost less than $15 million. Very doable.UmustBKidding said:
My son with bnsf signal said just the crossing equipment and install would be 750k because of regulatory changes. Elon could have boreing company drop the road and it would just be track to install. I am sure it was driven by complaints from state as to conditions of crossing and since no revenue just dog it out