Aggieland
Sponsored by

TERAFAB Development Watch Companies, Construction & Local Growth

79,370 Views | 549 Replies | Last: 6 hrs ago by maroon barchetta
techno-ag
How long do you want to ignore this user?
AG
Chewy said:

For something that just got filed on Monday and has 30 days to get approval, the "leaders" of this area sure are already sold on it.

Lots of positive talking points with no specifics.

Sure would be nice if that guy in the interview would share whatever chart he said has values aligned and how it was verified those values align.

I'm all for economic growth, but this sure feels rushed for those people it will affect.

This feels like a government project where it has to be passed to see the details that got passed.

That's not good government.

A lot of it comes down to things that are known, though. This is the biggest chip manufacturing company in the world. The majority of their facilities are in Taiwan and we've been encouraging them to build over here because the Chicoms are a persistent threat to taking over Taiwan.

Chip fabs are fabulously expensive and bring to their communities a host of economic benefits. The jobs pay a lot. Where one high tech factory emerges more often follow. We stand to benefit greatly if the NIMBYs get out of the way.
“What causes poverty? Nothing. It’s the original state, the default and starting point. The real question is, What causes prosperity?”
- Per Byland
Chewy
How long do you want to ignore this user?
AG
Is it unreasonable to ask for more details such as infrastructure and utility plans rather than a rapid decision in 30 days?

There's no details. Just, "Trust Us", it'll be good for everybody.

I don't think most people are opposed to this.

But, there are multiple examples of a well intentioned government who didn't think something through and an area was worse for it.

A few more details would go a long way to answering questions and concerns.

Surely there's some sort of master plan that could be shown for how roads will be affected. That's not an easy area to get in and out of with the railroad track and two lane roads.
Bob Yancy
How long do you want to ignore this user?
Chewy said:

Is it unreasonable to ask for more details such as infrastructure and utility plans rather than a rapid decision in 30 days?

There's no details. Just, "Trust Us", it'll be good for everybody.

I don't think most people are opposed to this.

But, there are multiple examples of a well intentioned government who didn't think something through and an area was worse for it.

A few more details would go a long way to answering questions and concerns.

Surely there's some sort of master plan that could be shown for how roads will be affected. That's not an easy area to get in and out of with the railroad track and two lane roads.


There are multidisciplinary teams from both cities, the county, the state, the feds, Texas A&M University, TTI, TxDOT, TSMC and more working on traffic and required infrastructure, power, water, housing, noise attenuation, recycling, community engagement, neighborhood impact and more.

This deal is not done. We are in the lead. The comptroller and the governor and the governor elect and CSISD are all looking at the JETI application which is the first- but still only preliminary, step.

We have a lot of preliminary information but much will have to be proven out by the math.

TSMC holds a deep sense of honor, integrity, keeping their word and working hand in glove with the community. That's what drew us to each other. It's a core cultural value they call "shin yong" and we call the Aggie Code of Honor.

All of your questions will be answered. Some will be to your satisfaction. Some likely will not. Disclosure and transparency on infrastructure demands and potential approaches will be shared. Engagement will happen.

Right now, one helpful document is the environmental assessment from the department of commerce on the impacts of the Arizona site. I think you'll find it's a cutting edge company that pours a lot into minimizing environmental impacts. The link is below. Run it through AI. Ask the tough questions. Pose them to your government representatives. It'll just take a bit more time to get there.

I hope that's fair.

Respectfully yours

Bob Yancy '95
Mayor, College Station

https://www.nist.gov/system/files/documents/2024/06/04/TSMC%20Draft%20EA%20June%203%202024%20.pdf
doubledog
How long do you want to ignore this user?
[Thread derail removed. -Staff]
Featured Video Previews
Chewy
How long do you want to ignore this user?
AG
As always, thanks Bob.

Sounds like roadways haven't even been considered. Which is fine to a degree if there is a cohesive look being done for what's best for the greater good of the Brazos Valley long term.

No since to do a road expansion that's not in the best interest of long term plans.

As I've stated, I have a piece of property that will border the current plans. For whatever reason, I was left out and I'm okay with that for now. I'd like to keep my place. I always knew growth would come my way so I'm not opposed to it.

I just don't want to get in a situation where I didn't have the full information to make the best decision for myself.

My wife and I have decided to not make any large scale improvements until we learn more.

If this is the worst thing that happens to me over the next 2-5 years, I'm going to keep living the blessed life that I do.

I just want to be as prepared as possible for what changes are in store.
Bob Yancy
How long do you want to ignore this user?
Chewy said:

As always, thanks Bob.

Sounds like roadways haven't even been considered. Which is fine to a degree if there is a cohesive look being done for what's best for the greater good of the Brazos Valley long term.

No since to do a road expansion that's not in the best interest of long term plans.

As I've stated, I have a piece of property that will border the current plans. For whatever reason, I was left out and I'm okay with that for now. I'd like to keep my place. I always knew growth would come my way so I'm not opposed to it.

I just don't want to get in a situation where I didn't have the full information to make the best decision for myself.

My wife and I have decided to not make any large scale improvements until we learn more.

If this is the worst thing that happens to me over the next 2-5 years, I'm going to keep living the blessed life that I do.

I just want to be as prepared as possible for what changes are in store.


You are apparently a wise and thoughtful individual and I'm sorry this potential project has interjected a level of uncertainty for you. I think your approach is best and based on the sound decibel numbers I'm seeing, which are very low, and based on tsmc's use of earthen berms and natural barriers and setbacks I don't think I'd move if I was happy with my patch- but I know that's very easy for me to say…I'm not out there.

Thanks for your feedback.

Respectfully

Bob Yancy '95
Mayor
doubledog
How long do you want to ignore this user?
NM
Independence H-D
How long do you want to ignore this user?
WTAW interview this morning.

Valen
How long do you want to ignore this user?
I've been reading through this thread, and I enjoy seeing people's concerns; it shows me people care. With that being said, I want to offer a little perspective, as I do from time to time.

A&M opened the gate for us to be one of the hubs of emerging technologies in the world with Rellis, the Space Institute/Engineering, the Semiconductor Institute, and the Space Force Captains School at the Bush School. This is obvious to us from the development of TeraFab, now this plant, projects going on at Rellis, and I'm gonna go ahead and assume other projects Mayor Yancy can't quite disclose yet.

While not being daft enough to pretend like there aren't going to be hiccups or issues that have to be solved, I simply want to put it out there how excited I am for the future because of these technologies. Now, I grew up 10 minutes from Johnson Space Center, so for me personally, it feels like a new space/technology race has kicked off, and we don't just get to witness it; we get to experience it. So many in this town love this country and either have or will at some point serve it. Our community, due to these projects, will have the same opportunity. From military and homeland applications to medical, phones, cars, and even that pesky dishwasher, all will make advancements due to the technology being designed, studied, and then executed here and in surrounding areas. From TeraFab in Anderson to Samsung and Blue Origin in Taylor, we are going to be the hub.

I may be delusionally optimistic, but I truly believe that these projects set up a huge path forward to lower our tax rate, increase our tax base, and are a direct path forward to paying our first responders a better, higher wage. I also believe it'll help with affordable housing because everyone is going to want to build here, and with more supply, we can bring prices down. A great example would be how the Northgate Towers are helping stabilize and even lower rent across the board because everyone has to be competitive. (I know this firsthand as a rent payer.)

These companies coming aren't random startups; these are the real deal. They know how to conserve water, be energy efficient, and be ahead in their field, and that makes me proud to want to be a part of it.

In my perspective, these opportunities are one of the largest segues to move wealth to the middle class; they are going to need plumbers, welders, electricians, cad designers, etc. Not only is the university set up to help supplement that, but so are our schools. Look at the phenomenal CTE building CSISD just built. They will have a direct path to put kids who do not want to go to college into high-paying trade jobs.

This is the American Dream: to be the best, to work for the best, to aim for the best. We have that opportunity now, and it will continue.

I don't want to have to worry about my pellet smoker needing a new control panel and not being able to get one because the PCR decided they want to take Taiwan or, God forbid, another fire. I want the drones I fly, the BBQ I cook, and the technology I use daily to be available to me on the world's worst day, and moving these types of projects here accomplishes that.

Ask your questions, express your concerns, but please also have some perspective that this will positively change people's lives, potentially for generations. Young people will create small businesses to serve these, or they'll go work there themselves. Then we will truly have a successful path to protect and preserve what makes College Station so special: the community.
maroon barchetta
How long do you want to ignore this user?
[Be respectful on this forum. -Staff]
BiochemAg97
How long do you want to ignore this user?
AG
While there will likely be many H1B visas, they still spend money in the local community (sales tax) and need places to live (HoT or prop tax).

I think we are also in a fairly unique situation here with A&M spinning up the semiconductor institute to train people for these jobs.

Given the way they build these fabs in a cookie cutter fashion (keep every little detail the same to minimize changes in the process), I suspect initially the fab will be staffed by people from Taiwan and some who have experience in Arizona. I would expect them to start rotating in a healthy dose of entry level jobs from TAMU Semiconductor Institute as it spins up.

Terafab isn't replicating an existing fab in Taiwan and instead is starting from scratch (or at least scaling up from their test fab in Austin). I'd expect less H1B visas but they probably will want to hire some people with knowledge/experience from other fabs.
reineraggie09
How long do you want to ignore this user?
AG
There is a lot here I agree with but the tax point.

I'm a grimes county resident. I was assured no tax increases (actually lowering of taxes) if Terrafab came to town. Never mind Terrafab was getting big tax breaks. Anderson and Iola ISDs then had meetings the SAME NIGHT only 30 minutes apart to raise taxes Aug 27th. Additionally the tax increases were nearly identical.

I may have been born at night but not last night. I do not believe for one second taxes will go down. Not with all the infrastructure upgrades that are coming.
Bob Yancy
How long do you want to ignore this user?
BiochemAg97 said:

While there will likely be many H1B visas, they still spend money in the local community (sales tax) and need places to live (HoT or prop tax).

I think we are also in a fairly unique situation here with A&M spinning up the semiconductor institute to train people for these jobs.

Given the way they build these fabs in a cookie cutter fashion (keep every little detail the same to minimize changes in the process), I suspect initially the fab will be staffed by people from Taiwan and some who have experience in Arizona. I would expect them to start rotating in a healthy dose of entry level jobs from TAMU Semiconductor Institute as it spins up.

Terafab isn't replicating an existing fab in Taiwan and instead is starting from scratch (or at least scaling up from their test fab in Austin). I'd expect less H1B visas but they probably will want to hire some people with knowledge/experience from other fabs.



About 600 people will be here to initialize if this happens. All the rest are local hires. All the rest. The misinformation about who they hire needs to be quelled and I'd like yalls help doing it, please. Oppose the project if you wish (not you Biochem) but it's incongruent with the facts to oppose it based on non-local hires, because that's not true. And, if it proceeds, there will be multiple fabs not just one. We are talking about thousands and thousands of jobs sourced with local Aggieland residents averaging $133,000 per year.

Those are the facts, and Happy Thanksgiving!

Respectfully

Bob Yancy
Mayor
techno-ag
How long do you want to ignore this user?
AG
Bob Yancy said:

BiochemAg97 said:

While there will likely be many H1B visas, they still spend money in the local community (sales tax) and need places to live (HoT or prop tax).

I think we are also in a fairly unique situation here with A&M spinning up the semiconductor institute to train people for these jobs.

Given the way they build these fabs in a cookie cutter fashion (keep every little detail the same to minimize changes in the process), I suspect initially the fab will be staffed by people from Taiwan and some who have experience in Arizona. I would expect them to start rotating in a healthy dose of entry level jobs from TAMU Semiconductor Institute as it spins up.

Terafab isn't replicating an existing fab in Taiwan and instead is starting from scratch (or at least scaling up from their test fab in Austin). I'd expect less H1B visas but they probably will want to hire some people with knowledge/experience from other fabs.



About 600 people will be here to initialize if this happens. All the rest are local hires. All the rest. The misinformation about who they hire needs to be quelled and I'd like yalls help doing it, please. Oppose the project if you wish (not you Biochem) but it's incongruent with the facts to oppose it based on non-local hires, because that's not true. And, if it proceeds, there will be multiple fabs not just one. We are talking about thousands and thousands of jobs sourced with local Aggieland residents averaging $133,000 per year.

Those are the facts, and Happy Thanksgiving!

Respectfully

Bob Yancy
Mayor

Amen. Thank you, Mayor. All those who have expressed doubt over high paying jobs when something new comes to town, a chip fab is definitely high paying.
“What causes poverty? Nothing. It’s the original state, the default and starting point. The real question is, What causes prosperity?”
- Per Byland
maroon barchetta
How long do you want to ignore this user?
Present all the facts so we can decide if we agree with them.
Bob Yancy
How long do you want to ignore this user?
maroon barchetta said:

Present all the facts so we can decide if we agree with them.


That's analogous to saying give me all the facts two weeks before you ordered the appraisal and inspection on a Home you want to buy.

Respectfully

Bob Yancy
Mayor
maroon barchetta
How long do you want to ignore this user?
One of our kids worked for several years with a tech manufacturer in Austin that is well-known.

My brother has worked 30 years for a company that supports all of the chip manufacturers in Austin as well as a number of other locations around the country.

Based on their experience, I would expect the numbers of visa holders to be different than advertised.
Stupe
How long do you want to ignore this user?
S
Where are those facts coming from?

Edit:

My friend that does work with these types of companies said the same thing as maroon barchetta.

One thing promised, another thing done.

You are coming across as if those of us talking about H1B visas are just pulling theories out of the air. In reality, it's skepticism based on experience and personal / professional relationships.
techno-ag
How long do you want to ignore this user?
AG
Well, my friend AI says about the existing number of H-1B visa holders at the Phoenix fab:

"While there is no public count of how many H1B visa holders are currently working at TSMC's Arizona chip fab, a filing total can provide context.

What the filing figures show is that in 2025, 132 H1B labor-condition applications were filed out of a reported 3500+ jobs."

I think we're going to be ok. H1-Bs are common in high tech but they won't make up the majority if the figures from Arizona hold true. And as pointed out, immigrant employees still spend money in the community. Red herring.
“What causes poverty? Nothing. It’s the original state, the default and starting point. The real question is, What causes prosperity?”
- Per Byland
benchmark
How long do you want to ignore this user?
AG
It will be interesting to learn more about TSMC's water plans - both reclamation and water import presumably from Robertson Co. TSMC-Phoenix has an aggressive water reclamation process and currently imports 1.4 million gal/day per fab. Also, their website claims their new reclamation plant will target a reclamation rate over 90% for 2028. For comparison, Bryan and College Station collectively use about 26 million gal/day.

A few questions about the fab water supply I hope someone is curious enough to ask:

  • How much water will this fab import from Robertson Co. via Wellborn SUD?
  • Will this fab include the new water reclamation process that can reclaim >90% of the water similar to their new Phoenix plant?
  • What dia and max capacity water transmission pipeline will be built for TSMC from Robertson Co - or will TSMC tap into the Wellborn SUD 30" transmission pipeline now under constr for late 2027?
  • Will the water agreement include expansion options for additional fabs? Explain?
maroon barchetta
How long do you want to ignore this user?
They also send a lot of money back home to where they are from. Texans/locals don't do that.

Sure the visa holders spend money locally. They have to eat and drive and rent or buy a place to live. But it's not the same percentage as the indigenous will spend.

Maroon herring.
Koko Chingo
How long do you want to ignore this user?
AG
Bob Yancy said:


About 600 people will be here to initialize if this happens. All the rest are local hires. All the rest. The misinformation about who they hire needs to be quelled and I'd like yalls help doing it, please. Oppose the project if you wish (not you Biochem) but it's incongruent with the facts to oppose it based on non-local hires, because that's not true. And, if it proceeds, there will be multiple fabs not just one. We are talking about thousands and thousands of jobs sourced with local Aggieland residents averaging $133,000 per year.

Those are the facts, and Happy Thanksgiving!

Respectfully

Bob Yancy
Mayor

Careful with your words Mayor.
You double down with "All the rest" and conclude with "Those are the facts".

Show us the proof. Did TSMC sign an agreement that starting at employee number 601 you must have a local address?

You know I am poking at you here. This is a big deal and many of us locals are in the camp of we support these two mega projects and growth. But we also fear home values and property taxes outpacing our incomes if we do not work for SpaceX or TSMC. My tax bill will be permanently stamped "HS CAP LOSS", I am there more often than not anyway.

I do believe SpaceX and TSMC will hire as many local people as they can. Not our of kindness or charity; because it just makes sense for them to do so. Many experienced people will want to work for a new facility. It could be someone from Samsung in Taylor, Texas Instruments in Sherman or any where else. It would be a great opportunity for an an experienced employee to move up the ladder a notch by switching companies.

The hard truth is that we do not have a lot of high tech manufacturing industries locally, in turn we do not have experienced employees. We barley have people who know PLC's (programmable logic controllers) and basic embedded systems. there is no one in the area who can service or install any of my instrumentation, control, or data acquisition systems and they are not even the most advanced things out there.

The Semiconductor Institute has made some headlines; It will be beneficial for manufacturing advancement and innovation. I believe A&M already has a department that can make a bigger impact on the floor or these facilities. Inside A&M Engineering is the department of "Engineering Technology & Industrial Distribution".

The degrees that do not get as much love and respect. Its where you go when Calculus III or differential equations beats you up like an MMA fighter. I think that will change a bit with three degrees offered at A&M. You may not have heard of them.

Electronic Systems Engineering Technology (ESET)
Manufacturing and Mechanical Engineering Technology (MMET)
Multidisciplinary Engineering Technology (MXET)

Those degree will put people to work right away on the floor. They will be massive amounts of internship opportunity too. A&M Ft. Worth will start those programs next fall. That department already does a lot of continuing education with industry.

As I close. We do not have a giant pool of candidates here because we do not have any high tech manufacturing. Its not bad mouthing the community. A lot of jobs will transfer; especially warehouse, admin, HR, accounting, facilities maintenance etc. But the meat & potatoes right at the center of their mission and production, not so much.

I am for the growth. But be careful Mayor with what you say. As a random nobody online the things I say aren't going to effect anyone. You are representing the city of College Station and this isn't one of those subjects you can just pop in and out making separate personal and official statement.

You went hard and doubled down on you statement and claimed facts without proof.

We know people from out of town are going to apply and get hired. We know TSMC will not sign a contract to only bring on 600 people from outside the area and hire locally for the rest. So when you make these hard claims that are not possible it is not a good look. And being on the internet people are not going to interpret things kindly.

....Careful with your words and do not start making plans with tax money that has not yet been deposited in the citied account.
Texasclipper
How long do you want to ignore this user?
AG
benchmark said:

It will be interesting to learn more about TSMC's water plans - both reclamation and water import presumably from Robertson Co. TSMC-Phoenix has an aggressive water reclamation process and currently imports 1.4 million gal/day per fab. Also, their website claims their new reclamation plant will target a reclamation rate over 90% for 2028. For comparison, Bryan and College Station collectively use about 26 million gal/day.

A few questions about the fab water supply I hope someone is curious enough to ask:

  • How much water will this fab import from Robertson Co. via Wellborn SUD?
  • Will this fab include the new water reclamation process that can reclaim >90% of the water similar to their new Phoenix plant?
  • What dia and max capacity water transmission pipeline will be built for TSMC from Robertson Co - or will TSMC tap into the Wellborn SUD 30" transmission pipeline now under constr for late 2027?
  • Will the water agreement include expansion options for additional fabs? Explain?


As a user of Wellborn SUD, I'm pretty skeptical that TSMC will be paying for all the water infrastructure. Wellborn has already raised rates to pay for "growth" and this likely means more of the same.

duckdog
How long do you want to ignore this user?
AG
Does anybody have insight into why TSMC picked that particular location?
TSMC locating in Brazos County would be a massive win for the region, which is why the specific site selection raises some questions. Strategically, the proposed 3,000 acre location seems to be a poor fit for a industrial / manufacturing / office development due to its limited, undersized road access and close proximity to rural residential communities and large residential tracts, bordered by a river and railroad tracks. Additionally, heavy residential and student traffic already creates major chokepoints along Wellborn, Holleman, and Harvey Mitchell and those are just a few of the infrastructure challenges with the chosen site.
maroon barchetta
How long do you want to ignore this user?
duckdog said:

Does anybody have insight into why TSMC picked that particular location?
TSMC locating in Brazos County would be a massive win for the region, which is why the specific site selection raises some questions. Strategically, the proposed 3,000 acre location seems to be a poor fit for a industrial / manufacturing / office development due to its limited, undersized road access and close proximity to rural residential communities and large residential tracts, bordered by a river and railroad tracks. Additionally, heavy residential and student traffic already creates major chokepoints along Wellborn, Holleman, and Harvey Mitchell and those are just a few of the infrastructure challenges with the chosen site.


And that's the concern.

One poster here would have you believe that questioning the location means you are totally against it coming here at all. We have some people who love to be experts on things they do not know, proposed to be placed in areas that seem like a bad fit for all involved.

It's the location that is the biggest concern. That, and officials from both cities weighing in on something proposed to be outside the city limits.
 
×
subscribe Verify your student status
See Subscription Benefits
Trial only available to users who have never subscribed or participated in a previous trial.