Was that White or Smith?
MsDoubleD81 said:
Was that White or Smith?
BuddysBud said:Muzzleblast said:
The impact is all over the north end of the county. We travel FM244 to Hwy 30 into College Station.
We are all negatively impacted by the traffic.
I live off 244 south of Iola. The traffic isn't as bad as it was ten years ago with the horizontal drilling. Most of the big trucks on 244 seem to be heading north from Hwy-30 into Iola. I wonder if the data center buildout is causing the truck traffic?
Even so, that traffic is mild compared to the school traffic going into Iola every morning and afternoon.
BuddysBud said:
...as for permits, at least for building a house, the only permit/inspection requirement is for a septic system. I don't know what the Terafab plans are for sewage treatment and disposal...
AggiePhil said:
Bob Yancy said:
There's been concerns expressed that city construction projects should be expedited to beat Terafab to the punch before it begins consuming all the concrete regionally. From this video, looks like that ship has sailed. Pretty sure that was a far-fetched notion.
Also- is there anyone in the concrete business on here? Where are they rumored to be getting concrete? Manufacturing it onsite? Please advise.
Respectfully
Yancy '95
SCHTICK00 said:
Onsite batch plants, aggregate brought in by rail. The rail will be rebuilt. Hwy 6 is asphalt paving. Concrete demand on that project is minimal
Diddler_44 said:
Likewise. I think they have done a good job so far. Weather has been favorable for the most part. I drive back and forth through there several times a week and the impact has really not been that bad.
tu ag said:SCHTICK00 said:
Onsite batch plants, aggregate brought in by rail. The rail will be rebuilt. Hwy 6 is asphalt paving. Concrete demand on that project is minimal
It isn't insubstantial, for the overall project. They are pouring a lot of concrete for the bridges.
Compared to terafab, it is nothing, but for a highway project in Texas, it is middle of the road in need.
BuddysBud said:
It is interesting that one of the big perceived advantages of this project was that it would use the brownfield site from the old lignite power plant. Now that it is being built, the main construction is on the opposite site of the lake.
I wonder if the actual power plant site will eventually be used for the onsite Terafab power generation site.
Gator92 said:BuddysBud said:
It is interesting that one of the big perceived advantages of this project was that it would use the brownfield site from the old lignite power plant. Now that it is being built, the main construction is on the opposite site of the lake.
I wonder if the actual power plant site will eventually be used for the onsite Terafab power generation site.
Terrafab will probably be grid connected, but the overwhelming majority of the power will be generated onsite.
Fed by natural gas...
BuddysBud said:Gator92 said:BuddysBud said:
It is interesting that one of the big perceived advantages of this project was that it would use the brownfield site from the old lignite power plant. Now that it is being built, the main construction is on the opposite site of the lake.
I wonder if the actual power plant site will eventually be used for the onsite Terafab power generation site.
Terrafab will probably be grid connected, but the overwhelming majority of the power will be generated onsite.
Fed by natural gas...
The tax abatement documents state that Terafab would be off grid and have their own power plant fed by natural gas. My question was how they were going to use the old power plant site. I was speculating that they would build their gas generators on the same location where the old coal power plant was located.
benchmark said:
FYI. Knife River applied to TCEQ about 2 months ago for 2 concrete batch plants near Carlos. The application is for permanent plants (not temporary) with a combined capacity rating of 300 CY/hr. This is a very big facility.
MyNameIsJeff said:
That's 5 years of nonstop max production to reach the estimated 13mil CY. The size and scope of Terafab is really hard to comprehend.
benchmark said:MyNameIsJeff said:
That's 5 years of nonstop max production to reach the estimated 13mil CY. The size and scope of Terafab is really hard to comprehend.
Not sure about the 13mil CY estimate. Sounds way too high IMO.