BiochemAg97 said:
While there will likely be many H1B visas, they still spend money in the local community (sales tax) and need places to live (HoT or prop tax).
I think we are also in a fairly unique situation here with A&M spinning up the semiconductor institute to train people for these jobs.
Given the way they build these fabs in a cookie cutter fashion (keep every little detail the same to minimize changes in the process), I suspect initially the fab will be staffed by people from Taiwan and some who have experience in Arizona. I would expect them to start rotating in a healthy dose of entry level jobs from TAMU Semiconductor Institute as it spins up.
Terafab isn't replicating an existing fab in Taiwan and instead is starting from scratch (or at least scaling up from their test fab in Austin). I'd expect less H1B visas but they probably will want to hire some people with knowledge/experience from other fabs.
Bob Yancy said:BiochemAg97 said:
While there will likely be many H1B visas, they still spend money in the local community (sales tax) and need places to live (HoT or prop tax).
I think we are also in a fairly unique situation here with A&M spinning up the semiconductor institute to train people for these jobs.
Given the way they build these fabs in a cookie cutter fashion (keep every little detail the same to minimize changes in the process), I suspect initially the fab will be staffed by people from Taiwan and some who have experience in Arizona. I would expect them to start rotating in a healthy dose of entry level jobs from TAMU Semiconductor Institute as it spins up.
Terafab isn't replicating an existing fab in Taiwan and instead is starting from scratch (or at least scaling up from their test fab in Austin). I'd expect less H1B visas but they probably will want to hire some people with knowledge/experience from other fabs.
About 600 people will be here to initialize if this happens. All the rest are local hires. All the rest. The misinformation about who they hire needs to be quelled and I'd like yalls help doing it, please. Oppose the project if you wish (not you Biochem) but it's incongruent with the facts to oppose it based on non-local hires, because that's not true. And, if it proceeds, there will be multiple fabs not just one. We are talking about thousands and thousands of jobs sourced with local Aggieland residents averaging $133,000 per year.
Those are the facts, and Happy Thanksgiving!
Respectfully
Bob Yancy
Mayor
maroon barchetta said:
Present all the facts so we can decide if we agree with them.
Bob Yancy said:
About 600 people will be here to initialize if this happens. All the rest are local hires. All the rest. The misinformation about who they hire needs to be quelled and I'd like yalls help doing it, please. Oppose the project if you wish (not you Biochem) but it's incongruent with the facts to oppose it based on non-local hires, because that's not true. And, if it proceeds, there will be multiple fabs not just one. We are talking about thousands and thousands of jobs sourced with local Aggieland residents averaging $133,000 per year.
Those are the facts, and Happy Thanksgiving!
Respectfully
Bob Yancy
Mayor
benchmark said:
It will be interesting to learn more about TSMC's water plans - both reclamation and water import presumably from Robertson Co. TSMC-Phoenix has an aggressive water reclamation process and currently imports 1.4 million gal/day per fab. Also, their website claims their new reclamation plant will target a reclamation rate over 90% for 2028. For comparison, Bryan and College Station collectively use about 26 million gal/day.
A few questions about the fab water supply I hope someone is curious enough to ask:
- How much water will this fab import from Robertson Co. via Wellborn SUD?
- Will this fab include the new water reclamation process that can reclaim >90% of the water similar to their new Phoenix plant?
- What dia and max capacity water transmission pipeline will be built for TSMC from Robertson Co - or will TSMC tap into the Wellborn SUD 30" transmission pipeline now under constr for late 2027?
- Will the water agreement include expansion options for additional fabs? Explain?
duckdog said:
Does anybody have insight into why TSMC picked that particular location?
TSMC locating in Brazos County would be a massive win for the region, which is why the specific site selection raises some questions. Strategically, the proposed 3,000 acre location seems to be a poor fit for a industrial / manufacturing / office development due to its limited, undersized road access and close proximity to rural residential communities and large residential tracts, bordered by a river and railroad tracks. Additionally, heavy residential and student traffic already creates major chokepoints along Wellborn, Holleman, and Harvey Mitchell and those are just a few of the infrastructure challenges with the chosen site.
Quote:
I think we're going to be ok. H1-Bs are common in high tech but they won't make up the majority if the figures from Arizona hold true. And as pointed out, immigrant employees still spend money in the community. Red herring.
EBrazosAg said:
"More OFFICIALS looking over the project would be better "?? No, I'm pretty sure we'd be better off with less "OFFICIALS ". I have no confidence that an increase in eyeballs from officials would drive any kind of benefit.