Aggieland
Sponsored by

TERAFAB Development Watch Companies, Construction & Local Growth

79,961 Views | 556 Replies | Last: 20 min ago by EBrazosAg
maroon barchetta
How long do you want to ignore this user?

Says the guy with no skin in the game on the north end of the county, as usual.
maroon barchetta
How long do you want to ignore this user?

Also, the mayor can't "bring home" something that is outside the city limits. Not one square foot of the proposed project site is inside the city limits.
EriktheRed
How long do you want to ignore this user?
AG
Yup, this one is all on the County and ISDs
Bob Yancy
How long do you want to ignore this user?
EriktheRed said:

maroon barchetta said:


Also, the mayor can't "bring home" something that is outside the city limits. Not one square foot of the proposed project site is inside the city limits.

Yup, this one is all on the County and ISDs


This will be a multiple jurisdictional approach, involving all local agencies, if approved. The county, both cities, TAMU and CSISD, even the state of Texas, and the federal government.

Affordability was on the ballot. One way to improve affordability is to recruit high paying jobs at all educational levels. Another is to incentivize affordable housing. If a project like this is to succeed, I believe it will take both.

The potential benefit to our public schools is enormous. This is not a data center. It's the manufacturing of the future. TSMC is a company serious about honor, integrity, community engagement, and state of the art resource protection. They recycle and recapture over 60% of their water usage, moving to 90% in just a handful of years. They employ sound dampening and earthen berms and landscaping techniques at their fabs.

As mayor, I am honored that they would consider us. I am also mindful of the impacts to local residents. A thoughtful approach will be required.

Lots of research ahead. I'm appreciative of the team approach and intergovernmental cooperation to this point.

Respectfully

Bob Yancy, Mayor
Featured Video Previews
MarkW91
How long do you want to ignore this user?
Also noted on another thread: I don't think this is the kind of project where the business could invoke eminent domain / condemnation. Assuming that is true, there are many private owners in this area (rather than one giant landowner) who may be holdouts from selling. Seems quite risky for the business.

Or am I wrong (either that eminent domain could apply, or that they have picked an area with relatively few landowners needing to sell, even if near high volume residential areas)?
EriktheRed
How long do you want to ignore this user?
AG
MarkW91 said:

Also noted on another thread: I don't think this is the kind of project where the business could invoke eminent domain / condemnation. Assuming that is true, there are many private owners in this area (rather than one giant landowner) who may be holdouts from selling. Seems quite risky for the business.

Or am I wrong (either that eminent domain could apply, or that they have picked an area with relatively few landowners needing to sell, even if near high volume

A very large portion of that area (over 50%) is one landowner
Chewy
How long do you want to ignore this user?
AG
Thanks for your participation on here, Mayor Yancy.

Is there a good way to follow the developments for this? I'm an adjacent landowner to this, but don't live in Aggieland so don't have access to all of the local media all the time.

I basically have this forum and Rusty Surrette on Twitter along with my neighbors I keep in touch with.
Chewy
How long do you want to ignore this user?
AG
Was one landowner. It's been sold.

There's no eminent domain as based on what I've heard, they're happily paying what people want.
Bob Yancy
How long do you want to ignore this user?
Chewy said:

Thanks for your participation on here, Mayor Yancy.

Is there a good way to follow the developments for this? I'm an adjacent landowner to this, but don't live in Aggieland so don't have access to all of the local media all the time.

I basically have this forum and Rusty Surrette on Twitter along with my neighbors I keep in touch with.


The governor and governor elect will be weighing in soon. College Station ISD will also be discussing it publicly. Depending on when/if it proceeds, you'll find all local governments will be discussing it transparently.

I hope that's fair. Please be assured we know people will be excited, and some concerned. We all want to get this right.

Respectfully

Bob Yancy, Mayor
Chewy
How long do you want to ignore this user?
AG
Appreciate your response and transparency.

While I couldn't vote in the mayoral election, I'm certainly glad you won due to your communications on here.
Bunk Moreland
How long do you want to ignore this user?
As a Soco resident I'm 100% in favor. This is a massive opportunity for our community.
Hornbeck
How long do you want to ignore this user?
AG
I regret I have but one blue star to give this, Mr. Mayor.
CS78
How long do you want to ignore this user?
I'll throw another negative nancy concern in. Has anyone thought about the fact that there's no highway access to this? You have river on the west side, RR tracks on the east, no access to the south, and "traffic calming" with a wave of student drivers to the north. All surrounded by houses and small streets. Can anyone really think of a worse area to put it? The trucking traffic during construction alone will be apocalyptic. The railroad crossings are already major pinch points. The future residential development that's happening on that side of the tracks is already going to be more than the current setup can handle. This could make traffic a nightmare for the people on that side of the tracks. Without adding a bridge across the Brazos or a whole new highway across the tracks, the location seems dumb, put simply. One of those things that people will cuss for the next 50 years. Hopefully the railroad is on board with expanding access? And if they aren't, it should be a deal breaker. And that needs to be settled BEFORE it's a problem, not after. This thing would seem much better suited for rellis direction or somewhere with highway access rather than trying to shoehorn it into what is very obviously an unsuitable area. It's like people get drunk on the grandiose plans and don't ask any of the important questions.
benchmark
How long do you want to ignore this user?
AG
MarkW91 said:

Also noted on another thread: I don't think this is the kind of project where the business could invoke eminent domain / condemnation. Assuming that is true, there are many private owners in this area (rather than one giant landowner) who may be holdouts from selling. Seems quite risky for the business.

The project is likely viable with the purchase contracts already in-hand. The largest tracts are contiguous, owned by just 4 unique landowners, and account for about 70% of the total 3,232 acres.
CS78
How long do you want to ignore this user?
Bob Yancy said:



Affordability was on the ballot. One way to improve affordability is to recruit high paying jobs at all educational levels. Another is to incentivize affordable housing. If a project like this is to succeed, I believe it will take both.

The potential benefit to our public schools is enormous. This is not a data center. It's the manufacturing of the future. TSMC is a company serious about honor, integrity, community engagement, and state of the art resource protection. They recycle and recapture over 60% of their water usage, moving to 90% in just a handful of years. They employ sound dampening and earthen berms and landscaping techniques at their fabs.

As mayor, I am honored that they would consider us. I am also mindful of the impacts to local residents. A thoughtful approach will be required.

Lots of research ahead. I'm appreciative of the team approach and intergovernmental cooperation to this point.

Respectfully

Bob Yancy, Mayor



How does multiple large injections of people in a short amount of time, skyrocketing property values, and increased property taxes help with affordable housing?

Where will they source their water from? Our river? What happens to the 40% of wastewater they dont recapture?

Can they ensure that all the people that already live in this residential area wont be able to hear operations from their beds at night?

I also dont see how this helps our public schools. Overcrowded classrooms followed by a never-ending cycle of more tax increases to keep up with the new need. And before someone steps in and says classes arent overcrowded, my 9th grader is in a math class, that cant be over 600sq/ft, with 35 students. They cant even fit enough desk in the room for everyone. Yes, there are some students that don't have a desk to sit in every day. Are we trying to make that the norm in all the classes?

I own five properties within spitting distance of this thing, will probably make a ton of money on it, and still don't think it's worth the cost.
MemphisAg1
How long do you want to ignore this user?
AG
CS78 said:

I'll throw another negative nancy concern in. Has anyone thought about the fact that there's no highway access to this? You have river on the west side, RR tracks on the east, no access to the south, and "traffic calming" with a wave of student drivers to the north. All surrounded by houses and small streets. Can anyone really think of a worse area to put it? The trucking traffic during construction alone will be apocalyptic. The railroad crossings are already major pinch points. The future residential development that's happening on that side of the tracks is already going to be more than the current setup can handle. This could make traffic a nightmare for the people on that side of the tracks. Without adding a bridge across the Brazos or a whole new highway across the tracks, the location seems dumb, put simply. One of those things that people will cuss for the next 50 years. Hopefully the railroad is on board with expanding access? And if they aren't, it should be a deal breaker. And that needs to be settled BEFORE it's a problem, not after. This thing would seem much better suited for rellis direction or somewhere with highway access rather than trying to shoehorn it into what is very obviously an unsuitable area. It's like people get drunk on the grandiose plans and don't ask any of the important questions.

Fair concerns for sure. The issue is much bigger than this chip factory. Growth is coming to BCS whether we like it or not and trying to stop projects on a selective basis isn't the answer. That'll just lead to repetitive acrimony between the "yes" and "no" camps.

What we need with high urgency is a realistic local/regional infrastructure plan (roads, loop, rail, tunnels, etc.) that can be implemented timely to avoid the worst outcomes and ultimately position us for much better outcomes. BCS' growth over the decades has been happenstance, with the next thing bolted onto the last thing. Kind of like how an old country home adds on a room periodically as the family grows.

That no longer works. We need much more, and our elected leaders need to drive it. That's not a shot at anybody current or past, just a frank assessment of reality.
Independence H-D
How long do you want to ignore this user?
MemphisAg1 said:

CS78 said:

I'll throw another negative nancy concern in. Has anyone thought about the fact that there's no highway access to this? You have river on the west side, RR tracks on the east, no access to the south, and "traffic calming" with a wave of student drivers to the north. All surrounded by houses and small streets. Can anyone really think of a worse area to put it? The trucking traffic during construction alone will be apocalyptic. The railroad crossings are already major pinch points. The future residential development that's happening on that side of the tracks is already going to be more than the current setup can handle. This could make traffic a nightmare for the people on that side of the tracks. Without adding a bridge across the Brazos or a whole new highway across the tracks, the location seems dumb, put simply. One of those things that people will cuss for the next 50 years. Hopefully the railroad is on board with expanding access? And if they aren't, it should be a deal breaker. And that needs to be settled BEFORE it's a problem, not after. This thing would seem much better suited for rellis direction or somewhere with highway access rather than trying to shoehorn it into what is very obviously an unsuitable area. It's like people get drunk on the grandiose plans and don't ask any of the important questions.

Fair concerns for sure. The issue is much bigger than this chip factory. Growth is coming to BCS whether we like it or not and trying to stop projects on a selective basis isn't the answer. That'll just lead to repetitive acrimony between the "yes" and "no" camps.

What we need with high urgency is a realistic local/regional infrastructure plan (roads, loop, rail, tunnels, etc.) that can be implemented timely to avoid the worst outcomes and ultimately position us for much better outcomes. BCS' growth over the decades has been happenstance, with the next thing bolted onto the last thing. Kind of like how an old country home adds on a room periodically as the family grows.

That no longer works. We need much more, and our elected leaders need to drive it. That's not a shot at anybody current or past, just a frank assessment of reality.

From what I have heard....again...hearsay.....

They will improve (or pay to improve) existing roads/infrastructure to handle additional traffic....this could also include a new "Koppe Bridge" to connect to the other side of the river and tie into planned expansion of existing roadways and the proposed "loop".
CS78
How long do you want to ignore this user?
Agreed. But just because it was ignored in the past doesn't mean we throw our hands up and make bad decisions now, in the name of progress. If this thing is put where it's proposed, it will very likely be a traffic nightmare for decades to come. A thorn in the side of anyone that uses Wellborn road or lives west of the tracks. And then we'll just hear stuff like "that's progress" "whatd you expect when you chose to live in a fast growing city", "its going to happen wither you like it or not" and a long list of excuses of why we had to just relax and take it.

But I always seem to be on the wrong side of these issues. I was for the east loop, but that was the one project that didn't happen. We need major highway work done yesterday. BEFORE these things come knocking on our door.
CS78
How long do you want to ignore this user?
Independence H-D said:

From what I have heard....again...hearsay.....

They will improve (or pay to improve) existing roads/infrastructure to handle additional traffic....this could also include a new "Koppe Bridge" to connect to the other side of the river and tie into planned expansion of existing roadways and the proposed "loop".


That would be a huge help. But it should be a requirement that those things at least be started before construction of the complex is started. No future promises.
MemphisAg1
How long do you want to ignore this user?
AG
I agree action is needed because the current situation with the coming growth is untenable.
doubledog
How long do you want to ignore this user?


KBTX news at 5 was placing the new facility on the "bend" of the Brazos, just west of Welborn. This seems an unlikely spot to put a large chip plant it would violate Feng Shui principles, not to mention land stability issues.

Were they wrong?

I thought it was bordered by Koppe Bridge Road, I&GN Road, and the Brazos River
Mas89
How long do you want to ignore this user?
AG
Chewy said:

Was one landowner. It's been sold.

There's no eminent domain as based on what I've heard, they're happily paying what people want.

Kelo v city of new London is the ruling eminent domain law

YES, they can take any property out there they need by eminent domain. Texas has repeatedly killed any meaningful reform legislation over the last 30 years I've been involved.
Bob Yancy
How long do you want to ignore this user?
TSMC

Roadways will be improved, including a potential bridge over the Brazos River- if approved.

In June of 1979, America had reached its zenith of manufacturing jobs, with 19,600,000 people of various education levels making things.

Today, 50 years later, with a population increase of over 120,000,000 more citizens, less than 13,000,000 people are employed in manufacturing.

Both parties squandered the quality of life of what once was the strongest middle class in the world.

Basically they decided foreign countries would make everything for us under what would prove to be a failed global economic model for our quality of life.

Today, affordability is on the ballot. Both parties realize their mistake, and they want to reclaim the mantle of manufacturing power house status and the quality of life that will come with it. And semiconductors are the core logic processors for everything on earth- from cars to phones to CT scanners.

We cannot decry affordability and simultaneously dismiss semiconductor manufacturing as a way to achieve it for our kids and grandkids.

I'm a grandfather of 5. My American Dream has been lived. Doesn't the next generation deserve their shot at an American Dream too?

I'm asking, respectfully

Bob Yancy, Mayor
Chewy
How long do you want to ignore this user?
AG
That's not correct. That peninsula is about 400 acres and in the floodplain. It deals with lots of erosion due to that bend in the river.
doubledog
How long do you want to ignore this user?
Chewy said:

That's not correct. That peninsula is about 400 acres and in the floodplain. It deals with lots of erosion due to that bend in the river.

I thought so. Here is the revised map.

Live local trusted... Well at least two out of the three

Chewy
How long do you want to ignore this user?
AG
Not doubting the legality of what they might be able to do.

Just saying what small sample I've heard they're not worried about eminent domain right now and paying what the owner wants.
CS78
How long do you want to ignore this user?
Yes, that all sounds great.

But it sounds more like you're running for president than watching out for the details of what's in residents' best interest.
Bob Yancy
How long do you want to ignore this user?
CS78 said:

Yes, that all sounds great.

But it sounds more like you're running for president than watching out for the details of what's in residents' best interest.


Respectfully, could that be supposition on your part? I'm pretty far in the weeds on those very concerns.

Respectfully

https://www.nist.gov/system/files/documents/2024/06/04/TSMC%20Draft%20EA%20June%203%202024%20.pdf
maroon barchetta
How long do you want to ignore this user?
The Koppe Bridge/Royder intersection and railroad crossing will need to happen sooner than later if they want to do this.

South Dowling and Capstone crossings don't make sense for this amount of traffic and Greens Prairie gets backed up as it is.

Put it west of 47 out near RELLIS. This isn't a great location for a big manufacturing facility.
Wvpd0707
How long do you want to ignore this user?
AG
47 would be a better location but putting together 3,200 acres would be hard. There aren't that many large tracts in that direction. Apparently the powers that determined the current location thought this to be a better location. It should be noted that C/S is being considered along with Sherman and Arizona. This is not a done deal. I'm for the project and hope we end up with it.
Bunk Moreland
How long do you want to ignore this user?
Independence H-D said:

MemphisAg1 said:

CS78 said:

I'll throw another negative nancy concern in. Has anyone thought about the fact that there's no highway access to this? You have river on the west side, RR tracks on the east, no access to the south, and "traffic calming" with a wave of student drivers to the north. All surrounded by houses and small streets. Can anyone really think of a worse area to put it? The trucking traffic during construction alone will be apocalyptic. The railroad crossings are already major pinch points. The future residential development that's happening on that side of the tracks is already going to be more than the current setup can handle. This could make traffic a nightmare for the people on that side of the tracks. Without adding a bridge across the Brazos or a whole new highway across the tracks, the location seems dumb, put simply. One of those things that people will cuss for the next 50 years. Hopefully the railroad is on board with expanding access? And if they aren't, it should be a deal breaker. And that needs to be settled BEFORE it's a problem, not after. This thing would seem much better suited for rellis direction or somewhere with highway access rather than trying to shoehorn it into what is very obviously an unsuitable area. It's like people get drunk on the grandiose plans and don't ask any of the important questions.

Fair concerns for sure. The issue is much bigger than this chip factory. Growth is coming to BCS whether we like it or not and trying to stop projects on a selective basis isn't the answer. That'll just lead to repetitive acrimony between the "yes" and "no" camps.

What we need with high urgency is a realistic local/regional infrastructure plan (roads, loop, rail, tunnels, etc.) that can be implemented timely to avoid the worst outcomes and ultimately position us for much better outcomes. BCS' growth over the decades has been happenstance, with the next thing bolted onto the last thing. Kind of like how an old country home adds on a room periodically as the family grows.

That no longer works. We need much more, and our elected leaders need to drive it. That's not a shot at anybody current or past, just a frank assessment of reality.

From what I have heard....again...hearsay.....

They will improve (or pay to improve) existing roads/infrastructure to handle additional traffic....this could also include a new "Koppe Bridge" to connect to the other side of the river and tie into planned expansion of existing roadways and the proposed "loop".


This is the way. When the county negotiates, we welcome them with open arms assuming they help us plan for our growth with investment in these types of upgrades.
doubledog
How long do you want to ignore this user?
Wvpd0707 said:

47 would be a better location but putting together 3,200 acres would be hard. There aren't that many large tracts in that direction. Apparently the powers that determined the current location thought this to be a better location. It should be noted that C/S is being considered along with Sherman and Arizona. This is not a done deal. I'm for the project and hope we end up with it.

Semiconductor fabrication plants ("fabs") consume vast volumes of water often 20 to 38 million liters (roughly 5 to 10 million gallons) per day per facility. Arizona is running low on water now and will be in the future.

Sherman gets too cold in the winter. (for my tastes).
MemphisAg1
How long do you want to ignore this user?
AG
I'm admittedly oversimplifying here, but I'll get the concept on the table. There's an opportunity to address the concerns around this project and drive improvements for the larger BCS area.

If you look at the map, the Wellborn highway is a good highway coming up from Hwy 6 just north of Navasota. It would need to be upgraded for long term growth, but the right-of-way is already there. Going north, you could split off in the Wellborn area in a NW direction across this site and tie into Hwy 47 just west of Easterwood. You could furthermore extend Hwy 47 across Hwy 21 and tie into TX-OSR coming back to the NE and synch up with Hwy 6 north of Bryan, effectively creating a western bypass around BCS, with Hwy 6 serving as somewhat of an east bypass.

That would provide direct access to this site from the south and north without requiring that traffic to transit thru the cities, and it would also open pathways for citizens and other businesses to get where they're going more efficiently also. Most of that path doesn't have homes in it, and hopefully our government leaders could entice the few who do to accept a financial offer for a right of way thru their property.

Anywhere you cross the railroad, you either want to go over or under it.

Very simplistic, and the idea can undoubtedly be improved, but it's an example of trying to look at the larger picture with solutions and not just the immediate area around this site.
maroon barchetta
How long do you want to ignore this user?
Dealing with the railroad is difficult and slow. The county found that out with the Greens Prairie/Straub/Wade situation.

Extending from Wellborn to 47 would be a massive undertaking with many eminent domain issues and lawsuits by landowners along that path.
MemphisAg1
How long do you want to ignore this user?
AG
Understand all that. This is an area where we could get the feds help with the railroads. I worked with them directly for many years. They were suppliers to my industry. You can get their attention but have to come in at a senior level. The local RR people can't agree to anything outside the lines of their day-to-day world.
 
×
subscribe Verify your student status
See Subscription Benefits
Trial only available to users who have never subscribed or participated in a previous trial.