ONE WEEK + 1
So the subfloor is finally done and all the drywall is up. The first coat of mud got put on about 75% of the walls last night but unfortunately I got started too late in the evening to get it all done. This evening should be a lot better because I will be able to come straight home from work and get started.
To answer a couple questions I am seeing, the plan is to Kerdi the shower floor, the shower wall, and the bottom 8" of the bathtub surround. Ditra will be used for the main bathroom floor. As far as some of the large gaps in the drywall, as I mentioned earlier, the large gaps are all situated around crown mouldings, door casings, and wainscotting so they will be easily hidden. I have employed the same method in other parts of the house and everything has worked out. The wainscotting is solid hardboard base layer with 1/2" Medex MDF on top of that so it is the same as putting up wood paneling. As long as you have a mostly flat surface, little gaps in the wall wont be noticable.
One week +2 hopefully schedule. Finish mudding, install Ditra, install Kerdi, and if there is still time, sand the mud and apply wall texture.