Trump plans on reviving the keystone xl pipeline

2,461 Views | 28 Replies | Last: 5 days ago by halfastros81
45-70Ag
How long do you want to ignore this user?
AG


Good trump.
nortex97
How long do you want to ignore this user?
AG
LFG.
Bocephus
How long do you want to ignore this user?
AG
Refining oil in Texas & creating thousands of jobs. LFG!!
TAMU ‘98 Ole Miss ‘21
Captain Pablo
How long do you want to ignore this user?
AG
Are the materials still available?
B-1 83
How long do you want to ignore this user?
AG
Good Trump. It is first and foremost a strategic pipeline. Now get us more modern refineries somehow.
Logos Stick
How long do you want to ignore this user?
Is this thing government subsidized? If not, and I can't complete it by the next presidential election, I'm not risking it. The Mental Illness Party will shut it down again.
e=mc2
How long do you want to ignore this user?
AG
Logos Stick said:

Is this thing government subsidized? If not, and I can't complete it by the next presidential election, I'm not risking it. The Mental Illness Party will shut it down again.


Elon can get this project finished in a week.
Tex100
How long do you want to ignore this user?
AG
Man! Who could have expected that?
TommyGun
How long do you want to ignore this user?
AG
Captain Pablo said:

Are the materials still available?


They've sold off at least some material from the project. Not sure how much. My company bought some motors at a huge discount from their surplus dealer.
techno-ag
How long do you want to ignore this user?
AG
Might have to incentivize it, and that's OK.
Trump will fix it.
Ferg
How long do you want to ignore this user?
At one point I had heard that the oil is now travelling on Warren Buffett's railroads, and its the equivalent of a half million cars emissions to move it that way vs pipeline.
FatZilla
How long do you want to ignore this user?
AG
Called it
https://texags.com/forums/16/topics/3505901/
Burn-It
How long do you want to ignore this user?
AG
TCE has been very public that even if DJT allowed permits to build, they have no intention to try because his term is too short to risk the left cancelling when he is out of office.
AKA 13-0
techno-ag
How long do you want to ignore this user?
AG
Burn-It said:

TCE has been very public that even if DJT allowed permits to build, they have no intention to try because his term is too short to risk the left cancelling when he is out of office.
That's where the incentivation will have to come in.
Trump will fix it.
ts5641
How long do you want to ignore this user?
God bless him! I hope this thing is up and running and we're depending on it by the time the next lefty promises the enviro-nazis they'll close it.
Muy
How long do you want to ignore this user?
AG
To complete this project would Trump need to get the pipeline under federal control and do something legally to protect the project and ongoing usage of it?
The Kraken
How long do you want to ignore this user?
AG
If that oil is still getting to market by other methods, what's the benefit other than for the owners of the pipeline? Would more oil be able to be moved to refineries?
Texas Yarddog
How long do you want to ignore this user?
AG
The Kraken said:

If that oil is still getting to market by other methods, what's the benefit other than for the owners of the pipeline? Would more oil be able to be moved to refineries?


More oil, safer, cheaper, and all the transport costs don't go to Warren Buffett.
CDUB98
How long do you want to ignore this user?
AG
good
CDUB98
How long do you want to ignore this user?
AG
Ferg said:

At one point I had heard that the oil is now travelling on Warren Buffett's railroads, and its the equivalent of a half million cars emissions to move it that way vs pipeline.
It was and is.

Environmental and Tribal Land reasons were just a cover. The real, behind the scenes reason was to keep the money train flowing for Buffet.
bkag9824
How long do you want to ignore this user?
AG
Captain Pablo said:

Are the materials still available?


Most, if not all, of the pipe has either already been sold for other projects or has been scrapped by now.

The pipe was prepped and ready for install when the project was unilaterally stopped. Incredible amount of waste that resulted in significant loss for investors over a bunch of bull**** politics.
doubledog
How long do you want to ignore this user?


Map of the current crude oil pipelines in the U.S.

Seems unreasonable to assume one more would impact the environment any more that all of these current pipelines.

https://atlas.eia.gov/datasets/eia::crude-oil-pipelines/explore
WBBQ74
How long do you want to ignore this user?
AG
Now show the natural gas pipelines.
Muy
How long do you want to ignore this user?
AG
doubledog said:



Map of the current crude oil pipelines in the U.S.

Seems unreasonable to assume one more would impact the environment any more that all of these current pipelines.

https://atlas.eia.gov/datasets/eia::crude-oil-pipelines/explore


Based on this map, time to TexIt.
FCBlitz
How long do you want to ignore this user?
Need those assets to generate profit and help reduce debt.
PA24
How long do you want to ignore this user?
AG
I am a retired pipeline engineer, SME.

I am a badass.
Gigem314
How long do you want to ignore this user?
AG


We're going to drill...drill...drill. We will build the biggest, most beautiful pipeline, you've ever seen. We will. It will be so beautiful.
Captain Pablo
How long do you want to ignore this user?
AG
bkag9824 said:

Captain Pablo said:

Are the materials still available?


Most, if not all, of the pipe has either already been sold for other projects or has been scrapped by now.

The pipe was prepped and ready for install when the project was unilaterally stopped. Incredible amount of waste that resulted in significant loss for investors over a bunch of bull**** politics.


Yeah I figured
halfastros81
How long do you want to ignore this user?
AG
I believe the Canadian's (Canadian government took the project over) recently completed the TransMountain pipeline expansion that increased export capacity of crude from Alberta to a pacific oil port from 300 to 900k bpd to get crude to the Pacific market. I am thinking opening up markets for Albertan crude was a primary driver for Keystone. If that's all true is Keystone still a viable project? Maybe some downsized version and picking up Bakken crude still makes sense, I dunno?
Refresh
Page 1 of 1
 
×
subscribe Verify your student status
See Subscription Benefits
Trial only available to users who have never subscribed or participated in a previous trial.