Hey y'all I have had a few bids for a metal shop inside CS city limits.
Its a 30x45 steel weld-up frame building with dirt prep, engineered reinforced slab, and anchored beams.
its a shed style roof with 11ft on the low side and 15ft on the high side.
the building has onedoor, two 10x10 roll up doors and three windows.
I submitted this info and rough drawings and survey to five contractors.
First contractor did a blind bid for $50k and said he would need money to come out the site.
A second contractor bid $37k after taking a look at the site.
Three other contractors never responded.
I feel like 28 per square ft is still kinda high, but I like the guy a lot.
Its a 30x45 steel weld-up frame building with dirt prep, engineered reinforced slab, and anchored beams.
its a shed style roof with 11ft on the low side and 15ft on the high side.
the building has onedoor, two 10x10 roll up doors and three windows.
I submitted this info and rough drawings and survey to five contractors.
First contractor did a blind bid for $50k and said he would need money to come out the site.
A second contractor bid $37k after taking a look at the site.
Three other contractors never responded.
I feel like 28 per square ft is still kinda high, but I like the guy a lot.