Thanks for the tips on the inspections, looks like final inspections will be in January due to my work/vacation schedule but the bathroom should be done this week! Here are some updates showing it almost there
Part way through tiling and re-floating:
grouted:
the nice part was I had to travel for a week so I hired a guy to work while I was gone and all of the above was done while I was gone, making for a nice little coming home surprise.
and here is what it looks like since then as of two days ago:
Coming in from the bedroom
closet
vanity with new lights going up because one shade was broken on the other's and "we" decided "we" didn't like them
grout being sealed with a color sealant because even the white grout wasn't white enough, stupid bright white tiles (left wall is sealed, right wall isn't):
fixtures in
water closet almost done, just waiting on a toilet seat
and as a huge success the next-door room is finally completely finished off. can't even tell the room used to be 18 inches wider
so the remaining timeline is
tonight: finishing of sealing the grout and marble surfaces, finishing caulking the shower, putting on the last few wall plates for outlets.
tomorrow: shower glass goes in, hang towel bars and closet shelves, and wire in the mini bathroom sound system.
friday: new carpet goes in bedroom (shoulda just rolled it up to start the project, see lesson: "go in with a firm plan"), and we move back into the master suite.
late december/early january: get final inspections and close out all permits.
Part way through tiling and re-floating:
grouted:
the nice part was I had to travel for a week so I hired a guy to work while I was gone and all of the above was done while I was gone, making for a nice little coming home surprise.
and here is what it looks like since then as of two days ago:
Coming in from the bedroom
closet
vanity with new lights going up because one shade was broken on the other's and "we" decided "we" didn't like them
grout being sealed with a color sealant because even the white grout wasn't white enough, stupid bright white tiles (left wall is sealed, right wall isn't):
fixtures in
water closet almost done, just waiting on a toilet seat
and as a huge success the next-door room is finally completely finished off. can't even tell the room used to be 18 inches wider
so the remaining timeline is
tonight: finishing of sealing the grout and marble surfaces, finishing caulking the shower, putting on the last few wall plates for outlets.
tomorrow: shower glass goes in, hang towel bars and closet shelves, and wire in the mini bathroom sound system.
friday: new carpet goes in bedroom (shoulda just rolled it up to start the project, see lesson: "go in with a firm plan"), and we move back into the master suite.
late december/early january: get final inspections and close out all permits.