So I have begun the project of remodeling my 1970 master bathroom. Rather than continuing to pollute multiple threads with my various threads as I have questions, I decided to make one all encompassing thread for all of my questions and to document my progress and lessons as I go to hopefully be helpful to others.
The Project:
I am currently taking my 1970s, builder grade, master bathroom and gutting it to the slab and studs, making it larger, moving plumbing, updating electrical and making a master bath to be proud of. I plan to do as much as I can, but have never officially done permitted, inspected work so am learning as I go.
Edit: here are the before pictures to begin to truly show the project.
The Plans:
(also if anyone can tell me why it is just showing the links to the pictures and not the actual pictures that would be awesome. Thanks)
Lessons so far:
-Houston won't let you do your own electrical and requires an electrical permit for just about everything past changing a light bulb.
-Some people in the permitting office will claim a homeowner cannot get a permit to do plumbing or any mechanical work, but if you live in the house, push back and go up to the 4th floor (inspections). there, and inspector can approve a homeowner permit allowing you to go back downstairs and purchase the permit.
-If you haven't done the work on a professional/permitted level before, don't assume the way you know is to code, read the relevant codes ahead of time to save yourself a headache later by leaving something out.
On that last note, to anyone who has had structural inspections before, or knows inspectors, how likely is it to fail a framing inspection due to one sole plate for a single wall not being pressure treated (all my walls rest directly on the slab)? all the other walls will have PT sole plates, but i jumped in before reading and didn't realize i needed PT soles before putting that wall up, and it will be HUGE pain to fix that.
Thanks!
The Project:
I am currently taking my 1970s, builder grade, master bathroom and gutting it to the slab and studs, making it larger, moving plumbing, updating electrical and making a master bath to be proud of. I plan to do as much as I can, but have never officially done permitted, inspected work so am learning as I go.
Edit: here are the before pictures to begin to truly show the project.
The Plans:
(also if anyone can tell me why it is just showing the links to the pictures and not the actual pictures that would be awesome. Thanks)
Lessons so far:
-Houston won't let you do your own electrical and requires an electrical permit for just about everything past changing a light bulb.
-Some people in the permitting office will claim a homeowner cannot get a permit to do plumbing or any mechanical work, but if you live in the house, push back and go up to the 4th floor (inspections). there, and inspector can approve a homeowner permit allowing you to go back downstairs and purchase the permit.
-If you haven't done the work on a professional/permitted level before, don't assume the way you know is to code, read the relevant codes ahead of time to save yourself a headache later by leaving something out.
On that last note, to anyone who has had structural inspections before, or knows inspectors, how likely is it to fail a framing inspection due to one sole plate for a single wall not being pressure treated (all my walls rest directly on the slab)? all the other walls will have PT sole plates, but i jumped in before reading and didn't realize i needed PT soles before putting that wall up, and it will be HUGE pain to fix that.
Thanks!