Just found this thread. OP is the ****in' man.
quote:
That is a crawler crane with a luffing boom jib on it. Biggie is a good description - I'd say that's a lot more than a 110 ton capacity. Probably closer to the 250 ton range. Usually the weight is not needed, but the reach and/or capacity at the end of the load chart.
quote:
The counter weights on back add up to 110. It also has 2 peices of the main crawler that are 14.5t each.
quote:
Here's a random question and I'm curious if anyone here can answer it. Looking at the east side, the ramps are structurally tied into the structure. I'm assuming that those are demolished with the new towers going up in the corners. How are those going to be removed without damaging the vertical supports for the existing second and third decks?
quote:
Here's a random question and I'm curious if anyone here can answer it. Looking at the east side, the ramps are structurally tied into the structure. I'm assuming that those are demolished with the new towers going up in the corners. How are those going to be removed without damaging the vertical supports for the existing second and third decks?
quote:
And all the championship letters and dates are gone.
quote:
Those are on the NW corner, not NE corner
quote:...but they're still gone.quote:
And all the championship letters and dates are gone.
Those are on the NW corner, not NE corner
quote:They have been gone awhile.
And all the championship letters and dates are gone.