$200 million for an underground university drive

4,135 Views | 48 Replies | Last: 2 days ago by Hornbeck
PS3D
How long do you want to ignore this user?
The other thing that I should've mentioned in my last post is that the Northgate they want to "save" (that is, basically from Church to past College Main) will be the businesses most adversely affected by the construction. If they don't get demolished for right of way reasons, the whole road will be torn up or severely reduced, making it difficult to access.

A more cynical viewpoint is that this is the real plan--bulldoze that whole strip, ostensibly for ROW reasons, then flip them to developers for when construction concludes. Am I completely bonkers with that idea?
Curator of [url=http://csroadsandretail.blogspot.com/]Brazos Buildings & Businesses[/url], the area's premier local history site.
maroon barchetta
How long do you want to ignore this user?
Yes
doubledog
How long do you want to ignore this user?
PS3D said:

The other thing that I should've mentioned in my last post is that the Northgate they want to "save" (that is, basically from Church to past College Main) will be the businesses most adversely affected by the construction. If they don't get demolished for right of way reasons, the whole road will be torn up or severely reduced, making it difficult to access.

A more cynical viewpoint is that this is the real plan--bulldoze that whole strip, ostensibly for ROW reasons, then flip them to developers for when construction concludes. Am I completely bonkers with that idea?


Northgate 2.0... I can see it.
doubledog
How long do you want to ignore this user?


In California this "wildlife" bridge is only ~114M.

If we call students "wildlife" you think we could get a bridge built for them? ; )

https://www.kcra.com/article/worlds-largest-wildlife-crossing-highway-101/74470342
Featured Video Previews
zigag09
How long do you want to ignore this user?
In that case, Darwinian principles play out and we get savings for the taxpayer and a better gene pool.
Aggie_Boomin 21
How long do you want to ignore this user?
AG
PS3D said:

Unless they want to build a tunnel while traffic continues overhead, how they are going to do it? Close off University Drive for 3 years? Knock down everything from Harry's to The Corner for a bypass road?

For $200M they could make Holleman Drive a six-lane road with a new overpass for 2818. That would definitely at least reduce vehicular traffic on University Drive...

I'd be surprised if this project ever happens but I think the approach would be reduce number of lanes in each direction, push traffic head-to-head on one side of University, and dig on the other. Then when that first side is dug down you switch both directions of traffic to be on that new lowered service, then dig down the old existing surface. Would be a LOT of closed intersections though for some commuter heavy routes, one of the many reasons TXDot wouldn't (and shouldn't) have the stomach to do this.
metroid_84
How long do you want to ignore this user?
I'm surprised there is this much pessimism about digging an underground tunnel. I recall a lot more optimism when A&M was discussing hiring The Boring Company to dig a Vegas-loop like transit system under campus.
Smeghead4761
How long do you want to ignore this user?
I was trying to envision pedestrian tunnels under University. I measured the distances of the sloped portions of PIckard's Pass and Old Main undercrossings on Google maps. I got between ~330-390'. I'm assuming there's a limit to how steep the slope can be, for ADA compliance reasons if nothing else.

So, assuming a crossing under University would need to get to roughly the same depth below grade, I did some more measurements. On the Northgate side, the downslope for the tunnel would have to start roughly at Church Ave. On the campus side the tunnel slope would start roughly in front of Walton Hall on Houston St, about New St on Ireland, or about 2/3 of the way to Polo Rd on Bizell.
PS3D
How long do you want to ignore this user?
metroid_84 said:

I'm surprised there is this much pessimism about digging an underground tunnel. I recall a lot more optimism when A&M was discussing hiring The Boring Company to dig a Vegas-loop like transit system under campus.

Ignoring the fact that it was always a pie-in-the-sky project, it wasn't quoted as taking millions of taxpayer dollars, disrupting one of the biggest corridors in town, or doing the economic damage to Northgate as such a project would do. (Plus Boring has a reputation for big promises, then never delivering).

Frankly, if you were suggesting digging underneath TAMU, a better plan would be adding some sort of new north-south road below campus, like connecting College Drive to Anderson or Welsh.
Curator of [url=http://csroadsandretail.blogspot.com/]Brazos Buildings & Businesses[/url], the area's premier local history site.
maroon barchetta
How long do you want to ignore this user?
Better go deep.

Lots of storm water and waste water and domestic water and thermals and electrical duct banks and fiber optic and…
PS3D
How long do you want to ignore this user?
maroon barchetta said:

Better go deep.

Lots of storm water and waste water and domestic water and thermals and electrical duct banks and fiber optic and…

I know. Of all my new infrastructure dreams, that's the least likely to happen. (I would be happy if the two Balcones halves connected).

Frankly, new road infrastructure in town is a pipe dream. It gets people vocally riled up and isn't a "pretty" project that a politician can make "their" project, like the future mayor's Wolf Pen amphitheater project.
Curator of [url=http://csroadsandretail.blogspot.com/]Brazos Buildings & Businesses[/url], the area's premier local history site.
maroon barchetta
How long do you want to ignore this user?
I would like Southern Plantation connected to Victoria but it would need a traffic light being by the high school.
doubledog
How long do you want to ignore this user?
Smeghead4761 said:

I was trying to envision pedestrian tunnels under University. I measured the distances of the sloped portions of PIckard's Pass and Old Main undercrossings on Google maps. I got between ~330-390'. I'm assuming there's a limit to how steep the slope can be, for ADA compliance reasons if nothing else.

So, assuming a crossing under University would need to get to roughly the same depth below grade, I did some more measurements. On the Northgate side, the downslope for the tunnel would have to start roughly at Church Ave. On the campus side the tunnel slope would start roughly in front of Walton Hall on Houston St, about New St on Ireland, or about 2/3 of the way to Polo Rd on Bizell.

That would mean that the students on the far north side of campus and the people at northgate/mcdonalds would need to walk away from university drive to reach the opening of the tunnel. Not going to happen.
Hornbeck
How long do you want to ignore this user?
AG
maroon barchetta said:

Better go deep.

Lots of storm water and waste water and domestic water and thermals and electrical duct banks and fiber optic and…


Steam tunnels!