Aggieland
Sponsored by

$200 million for an underground university drive

4,688 Views | 53 Replies | Last: 1 day ago by Aggie_Boomin 21
PS3D
How long do you want to ignore this user?
The other thing that I should've mentioned in my last post is that the Northgate they want to "save" (that is, basically from Church to past College Main) will be the businesses most adversely affected by the construction. If they don't get demolished for right of way reasons, the whole road will be torn up or severely reduced, making it difficult to access.

A more cynical viewpoint is that this is the real plan--bulldoze that whole strip, ostensibly for ROW reasons, then flip them to developers for when construction concludes. Am I completely bonkers with that idea?
Curator of [url=http://csroadsandretail.blogspot.com/]Brazos Buildings & Businesses[/url], the area's premier local history site.
maroon barchetta
How long do you want to ignore this user?
Yes
doubledog
How long do you want to ignore this user?
PS3D said:

The other thing that I should've mentioned in my last post is that the Northgate they want to "save" (that is, basically from Church to past College Main) will be the businesses most adversely affected by the construction. If they don't get demolished for right of way reasons, the whole road will be torn up or severely reduced, making it difficult to access.

A more cynical viewpoint is that this is the real plan--bulldoze that whole strip, ostensibly for ROW reasons, then flip them to developers for when construction concludes. Am I completely bonkers with that idea?


Northgate 2.0... I can see it.
doubledog
How long do you want to ignore this user?


In California this "wildlife" bridge is only ~114M.

If we call students "wildlife" you think we could get a bridge built for them? ; )

https://www.kcra.com/article/worlds-largest-wildlife-crossing-highway-101/74470342
zigag09
How long do you want to ignore this user?
In that case, Darwinian principles play out and we get savings for the taxpayer and a better gene pool.
Aggie_Boomin 21
How long do you want to ignore this user?
AG
PS3D said:

Unless they want to build a tunnel while traffic continues overhead, how they are going to do it? Close off University Drive for 3 years? Knock down everything from Harry's to The Corner for a bypass road?

For $200M they could make Holleman Drive a six-lane road with a new overpass for 2818. That would definitely at least reduce vehicular traffic on University Drive...

I'd be surprised if this project ever happens but I think the approach would be reduce number of lanes in each direction, push traffic head-to-head on one side of University, and dig on the other. Then when that first side is dug down you switch both directions of traffic to be on that new lowered service, then dig down the old existing surface. Would be a LOT of closed intersections though for some commuter heavy routes, one of the many reasons TXDot wouldn't (and shouldn't) have the stomach to do this.
metroid_84
How long do you want to ignore this user?
I'm surprised there is this much pessimism about digging an underground tunnel. I recall a lot more optimism when A&M was discussing hiring The Boring Company to dig a Vegas-loop like transit system under campus.
Smeghead4761
How long do you want to ignore this user?
I was trying to envision pedestrian tunnels under University. I measured the distances of the sloped portions of PIckard's Pass and Old Main undercrossings on Google maps. I got between ~330-390'. I'm assuming there's a limit to how steep the slope can be, for ADA compliance reasons if nothing else.

So, assuming a crossing under University would need to get to roughly the same depth below grade, I did some more measurements. On the Northgate side, the downslope for the tunnel would have to start roughly at Church Ave. On the campus side the tunnel slope would start roughly in front of Walton Hall on Houston St, about New St on Ireland, or about 2/3 of the way to Polo Rd on Bizell.
PS3D
How long do you want to ignore this user?
metroid_84 said:

I'm surprised there is this much pessimism about digging an underground tunnel. I recall a lot more optimism when A&M was discussing hiring The Boring Company to dig a Vegas-loop like transit system under campus.

Ignoring the fact that it was always a pie-in-the-sky project, it wasn't quoted as taking millions of taxpayer dollars, disrupting one of the biggest corridors in town, or doing the economic damage to Northgate as such a project would do. (Plus Boring has a reputation for big promises, then never delivering).

Frankly, if you were suggesting digging underneath TAMU, a better plan would be adding some sort of new north-south road below campus, like connecting College Drive to Anderson or Welsh.
Curator of [url=http://csroadsandretail.blogspot.com/]Brazos Buildings & Businesses[/url], the area's premier local history site.
maroon barchetta
How long do you want to ignore this user?
Better go deep.

Lots of storm water and waste water and domestic water and thermals and electrical duct banks and fiber optic and…
PS3D
How long do you want to ignore this user?
maroon barchetta said:

Better go deep.

Lots of storm water and waste water and domestic water and thermals and electrical duct banks and fiber optic and…

I know. Of all my new infrastructure dreams, that's the least likely to happen. (I would be happy if the two Balcones halves connected).

Frankly, new road infrastructure in town is a pipe dream. It gets people vocally riled up and isn't a "pretty" project that a politician can make "their" project, like the future mayor's Wolf Pen amphitheater project.
Curator of [url=http://csroadsandretail.blogspot.com/]Brazos Buildings & Businesses[/url], the area's premier local history site.
maroon barchetta
How long do you want to ignore this user?
I would like Southern Plantation connected to Victoria but it would need a traffic light being by the high school.
doubledog
How long do you want to ignore this user?
Smeghead4761 said:

I was trying to envision pedestrian tunnels under University. I measured the distances of the sloped portions of PIckard's Pass and Old Main undercrossings on Google maps. I got between ~330-390'. I'm assuming there's a limit to how steep the slope can be, for ADA compliance reasons if nothing else.

So, assuming a crossing under University would need to get to roughly the same depth below grade, I did some more measurements. On the Northgate side, the downslope for the tunnel would have to start roughly at Church Ave. On the campus side the tunnel slope would start roughly in front of Walton Hall on Houston St, about New St on Ireland, or about 2/3 of the way to Polo Rd on Bizell.

That would mean that the students on the far north side of campus and the people at northgate/mcdonalds would need to walk away from university drive to reach the opening of the tunnel. Not going to happen.
Hornbeck
How long do you want to ignore this user?
AG
maroon barchetta said:

Better go deep.

Lots of storm water and waste water and domestic water and thermals and electrical duct banks and fiber optic and…


Steam tunnels!
metroid_84
How long do you want to ignore this user?
PS3D said:

metroid_84 said:

I'm surprised there is this much pessimism about digging an underground tunnel. I recall a lot more optimism when A&M was discussing hiring The Boring Company to dig a Vegas-loop like transit system under campus.

Ignoring the fact that it was always a pie-in-the-sky project, it wasn't quoted as taking millions of taxpayer dollars, disrupting one of the biggest corridors in town, or doing the economic damage to Northgate as such a project would do. (Plus Boring has a reputation for big promises, then never delivering).


The Boring Company proposal was estimated to cost $250-350 million dollars (see the appendix in https://president.tamu.edu/_files/_documents/2024-capacity-report-jan-2025.pdf), and would have required asking the state legislature to cover that cost (the university has no ability to cover a cost of that size for non-academic purposes).

So, yes, it was actually going to take hundreds of millions of dollars of taxpayer dollars.

It strikes me re-reading this thread that perhaps ADA compliance might make pedestrian bridges a less workable design than in the past. Is it perhaps that one would need even more space for an ADA compliant ramp over the road than the ramps for a tunnel under the road?
GasAg90
How long do you want to ignore this user?
Stupid question, but why don't the students/pedestrians use the crosswalks? If this is truly for safety it would be much cheaper to post a couple of officers full time to write tickets for jaywalking.
maroon barchetta
How long do you want to ignore this user?
GasAg90 said:

Stupid question, but why don't the students/pedestrians use the crosswalks? If this is truly for safety it would be much cheaper to post a couple of officers full time to write tickets for jaywalking.


People are stupid and lazy and entitled.

This applies to many more scenarios than crossing the street.
PS3D
How long do you want to ignore this user?
metroid_84 said:

PS3D said:

metroid_84 said:

I'm surprised there is this much pessimism about digging an underground tunnel. I recall a lot more optimism when A&M was discussing hiring The Boring Company to dig a Vegas-loop like transit system under campus.
Ignoring the fact that it was always a pie-in-the-sky project, it wasn't quoted as taking millions of taxpayer dollars, disrupting one of the biggest corridors in town, or doing the economic damage to Northgate as such a project would do. (Plus Boring has a reputation for big promises, then never delivering).

The Boring Company proposal was estimated to cost $250-350 million dollars (see the appendix in https://president.tamu.edu/_files/_documents/2024-capacity-report-jan-2025.pdf), and would have required asking the state legislature to cover that cost (the university has no ability to cover a cost of that size for non-academic purposes).
So, yes, it was actually going to take hundreds of millions of dollars of taxpayer dollars.

Ah, I didn't read much into the proposal. It seemed pretty vague for what it was, and I remember thinking at the time it wouldn't really FIX anything. For that sort of money you could either connect major roads underneath campus, or pedestrian tunnels linking buildings.
Quote:

It strikes me re-reading this thread that perhaps ADA compliance might make pedestrian bridges a less workable design than in the past. Is it perhaps that one would need even more space for an ADA compliant ramp over the road than the ramps for a tunnel under the road?

Probably not because of the clearance issue, you might get away with having a less-than-compliant slope for the roadway, but it would need higher clearance, a 14.5 feet minimum. The clearance of Pickard Pass is 10 feet.

Curator of [url=http://csroadsandretail.blogspot.com/]Brazos Buildings & Businesses[/url], the area's premier local history site.
Aggie_Boomin 21
How long do you want to ignore this user?
AG
metroid_84 said:


It strikes me re-reading this thread that perhaps ADA compliance might make pedestrian bridges a less workable design than in the past. Is it perhaps that one would need even more space for an ADA compliant ramp over the road than the ramps for a tunnel under the road?

If you mean pedestrian ramp length over University vs pedestrian ramp length under University, I would expect ramp length required to be larger for going over. Both ends of each version will have the same allowed max slope for ADA compliance, but the clearance going under the road likely has the opportunity to be less than the required clearance of going over. I'm basically saying the vertical difference between the walkway and road would be less going under than over. This is ignoring all other decisions that could drive a pedestrian tunnel being lower than what the minimum road section thickness would need to be (like utility conflicts).
Refresh
Page 2 of 2 ▼
 
×
subscribe Verify your student status
See Subscription Benefits
Trial only available to users who have never subscribed or participated in a previous trial.