I just got a chance to take a good look at this. Any train of more than 2 minutes in crossing duration will likely stop traffic in all directions creating a much worse mess than they do now. It is clear that the engineers who designed this "fix" don't ever really drive this stretch on a regular basis. Thoughts?
[url=https://www.bryantx.gov/wellborn-road-lane-reconfiguration-begins-july-24th/][/url]
https://www.bryantx.gov/wellborn-road-lane-reconfiguration-begins-july-24th/
[url=https://www.bryantx.gov/wellborn-road-lane-reconfiguration-begins-july-24th/][/url]
https://www.bryantx.gov/wellborn-road-lane-reconfiguration-begins-july-24th/