My house was built in 1960 and my driveway had tons of upheave and drainage issues since the dirt was bad and there was no reinforcing. Started demo on it today.














mrmill3218
How long do you want to ignore this user?




mrmill3218
How long do you want to ignore this user?

mrmill3218
How long do you want to ignore this user?



Corps_Ag12
How long do you want to ignore this user?
Do you not need to do a three way to tie the new anpproach into the alley street?
tunefx
How long do you want to ignore this user?
Thanks for posting! Can't wait to see the progress.
mrmill3218
How long do you want to ignore this user?
Corps_Ag12 said:

Do you not need to do a three way to tie the new anpproach into the alley street?
No, not planning on it.
mrmill3218
How long do you want to ignore this user?
Work continues today.










mrmill3218
How long do you want to ignore this user?
Rebar, forms, drainage pipe, demo of sidewalk.







mrmill3218
How long do you want to ignore this user?






mrmill3218
How long do you want to ignore this user?

mrmill3218
How long do you want to ignore this user?
Starting some grading. Will do a trench drain toward the middle of the driveway and tie it into an existing inlet that goes to the street in the front.





mrmill3218
How long do you want to ignore this user?
Digging out for the trench drain and more forming.


Dr. Doctor
How long do you want to ignore this user?
Man, all that rebar in the old concrete made taking it out a PAIN!

/s

~egon
mrmill3218
How long do you want to ignore this user?
More pics.




Aggietaco
How long do you want to ignore this user?
Based on your crap looking soil, be ready for more cracks. I would ask them to saw cut as soon as possible and cut into smaller sections than typical to keep the cracks to a minimum.
mrmill3218
How long do you want to ignore this user?
Forming up for the trench drain.



mrmill3218
How long do you want to ignore this user?
Done for the day.


mrmill3218
How long do you want to ignore this user?
Work continues this morning. Doing a bit of dewatering from the rain we had over the weekend.






mrmill3218
How long do you want to ignore this user?
Work continues today. Doing a bit of dewatering and drainage work.











Whoop Delecto
How long do you want to ignore this user?
mrmill3218
How long do you want to ignore this user?
Putting some base down.








mrmill3218
How long do you want to ignore this user?
Laying out rebar.





mrmill3218
How long do you want to ignore this user?
Placing and tying rebar.





mrmill3218
How long do you want to ignore this user?
Doweling into the slab.
mrmill3218
How long do you want to ignore this user?






mrmill3218
How long do you want to ignore this user?
Final shots for the day.





mrmill3218
How long do you want to ignore this user?
Dr. Doctor said:

Man, all that rebar in the old concrete made taking it out a PAIN!

/s

~egon

Lol, isn't that crazy? The way they used to do things is so baffling sometimes.
mrmill3218
How long do you want to ignore this user?
Whoop Delecto said:

Prior to placing concrete, I buried conduits crossing under my driveway area for landscape lights and irrigation.

That is a great idea. Thankfully I already have irrigation back there. Could use some lighting though.
mrmill3218
How long do you want to ignore this user?
Aggietaco said:

Based on your crap looking soil, be ready for more cracks. I would ask them to saw cut as soon as possible and cut into smaller sections than typical to keep the cracks to a minimum.

Had some base put down to counteract this. Concrete will also be 6" with bigger rebar.
mefoghorn
How long do you want to ignore this user?
What's going in the bottom of that trench drain? You're not just gonna let cement run down in there, right?
AggieArchitect04
How long do you want to ignore this user?
They need to put some bricks/rocks under that steel to elevate it. You don't want it lying directly on the base...that doesn't do much reinforcing.
mrmill3218
How long do you want to ignore this user?
They put it on chairs before they poured.
mrmill3218
How long do you want to ignore this user?
No, I'll post a pic here shortly.
mrmill3218
How long do you want to ignore this user?
Finished product.