I'm in Round Rock. Going to tear down and old shed, put up a new one and run electricity to it. Since I'll have to trench anyway, I'm also going to run electric to another part of the yard for some lighting and such. To do this, I'll also have to add a sub panel. I'll have to pull a permit for the shed/electric. A couple questions on this:
1. This is more of a general question, but if I pull a permit for a shed with electric, will that cover adding the sub panel since it include electrical work?
2. This is more the question that I'm interested in near term. Can I go ahead and trench, run my wires/conduit, and temporarily cap the conduit, not connecting with wires. Then pull a permit when I'm ready to connect everything and put up the shed? The reason I ask is because we are planning on doing some landscaping before I'd get to the shed project and the trenching would have to go through that. I've already called 8-1-1 and have everything marked.
guessing there will need to be an inspection that might prevent me from doing this.
1. This is more of a general question, but if I pull a permit for a shed with electric, will that cover adding the sub panel since it include electrical work?
2. This is more the question that I'm interested in near term. Can I go ahead and trench, run my wires/conduit, and temporarily cap the conduit, not connecting with wires. Then pull a permit when I'm ready to connect everything and put up the shed? The reason I ask is because we are planning on doing some landscaping before I'd get to the shed project and the trenching would have to go through that. I've already called 8-1-1 and have everything marked.
guessing there will need to be an inspection that might prevent me from doing this.