I am wanting to get some work done in 2 bathrooms.
Bathroom 1- new tile floor, new bathtub and tile all around it
Bathroom 2- new tile floor, re-tile shower, new shower pan, new sliding door, tear down tile around toilet and vanity and replace with drywall,
All together i added up about 184 square feet of tile. Also I would get new faucets/ shower head in each and new door on the stand up shower.
Here are the estimates so far.
1- $6300 plus materials
2- $4700 plus materials
3- $3650 includes materials
4- $5700 plus materials
still waiting on 2 more bids
The one including materials seems to cheap to be true compared to the others. Should I be worried about that? What should a job like this cost?
bathroom 1 with bathtub
bathroom 2 stand up shower
floor in bathroom 2
Bathroom 1- new tile floor, new bathtub and tile all around it
Bathroom 2- new tile floor, re-tile shower, new shower pan, new sliding door, tear down tile around toilet and vanity and replace with drywall,
All together i added up about 184 square feet of tile. Also I would get new faucets/ shower head in each and new door on the stand up shower.
Here are the estimates so far.
1- $6300 plus materials
2- $4700 plus materials
3- $3650 includes materials
4- $5700 plus materials
still waiting on 2 more bids
The one including materials seems to cheap to be true compared to the others. Should I be worried about that? What should a job like this cost?
bathroom 1 with bathtub
bathroom 2 stand up shower
floor in bathroom 2