My GC said adding the line wouldn't be a problem, but they probably should do a load calc to make sure I have enough BTUs.
What are the concerns here?
On gas already we have: hot water heater, central furnace, dryer.
Is it really possible that we wouldn't have enough gas flow to also support a gas range / oven?
What are the concerns here?
On gas already we have: hot water heater, central furnace, dryer.
Is it really possible that we wouldn't have enough gas flow to also support a gas range / oven?