3/17/14
I just got back from taking some pictures. It looks absolutely fantastic. From what I've seen so far this offseason, I believe the construction should easily be done for this up coming season. If I had to guess, I'd say that the facade of the northeast tower will be done in about a week. They have the siding of that tower completely up on 2 sides, 2 panels short of being finished on the 3rd, and have already started it on the side that will be against Kyle. I think the southeast tower will have all the siding up within a month, considering it appears they're becoming close to finishing the structure. I can't really tell what all else needs to be done on the towers, but it doesn't look like a whole bunch left. No telling how long it will be before the south endzone will be finished, but based on what I've seen with the east side first deck, I don't think it should be a problem. The only thing I'm completely unsure about is the exterior of the east side. There hasn't been too much visually happening besides the beams in the center, but they have been constantly working on it, so I have faith.