MPO just keeps on with the hits. All with other peoples money …..
BCS Metropolitan Planning Organization prepare for study regarding University Drive safety revamp https://www.kbtx.com/2025/11/20/bcs-metropolitan-planning-organization-prepare-study-regarding-university-drive-safety-revamp/
No material on this site is intended to be a substitute for professional medical advice, diagnosis or treatment. See full Medical Disclaimer.
LOYAL AG
How long do you want to ignore this user?
AG
Not sure I get the complaint. By definition this is with others peoples money. Infrastructure is one of the few legitimate things government does. That stretch of road isn't good for really anyone right now.
BQ_90
How long do you want to ignore this user?
AG
Quote:

"The Bush Wellburn project starts in [20]27 and it takes three years to construct, that's 2030 before we can realistically expect to do anything on University Drive," Rudge explained. "We can't be doing the George Bush [and] Wellburn intersection, and construction on University Drive at the same time. It just won't work."

First off are they sure they mean 2027 and not 2127. Second, it'll be miracle if they do it in 3 years. How about you fix Welburn and Bush now, then worry about University after its done.
Smeghead4761
How long do you want to ignore this user?
BQ_90 said:

Quote:

"The Bush Wellburn project starts in [20]27 and it takes three years to construct, that's 2030 before we can realistically expect to do anything on University Drive," Rudge explained. "We can't be doing the George Bush [and] Wellburn intersection, and construction on University Drive at the same time. It just won't work."

First off are they sure they mean 2027 and not 2127. Second, it'll be miracle if they do it in 3 years. How about you fix Welburn and Bush now, then worry about University after its done.

That sounds like what he was saying. Do Bush and Wellborn first in 2027, then University when that's done.
Sub4
How long do you want to ignore this user?
AG
BQ_90 said:

How about you fix Welburn and Bush now, then worry about University after its done.

Birdie told me the railroads aren't cooperating too well, and that's the largest reason for the delay.
BQ_90
How long do you want to ignore this user?
AG
Smeghead4761 said:

BQ_90 said:

Quote:

"The Bush Wellburn project starts in [20]27 and it takes three years to construct, that's 2030 before we can realistically expect to do anything on University Drive," Rudge explained. "We can't be doing the George Bush [and] Wellburn intersection, and construction on University Drive at the same time. It just won't work."

First off are they sure they mean 2027 and not 2127. Second, it'll be miracle if they do it in 3 years. How about you fix Welburn and Bush now, then worry about University after its done.

That sounds like what he was saying. Do Bush and Wellborn first in 2027, then University when that's done.

You missed the NOW part. Again how long has this been on the books. If it's like poster below says its the railroad, then dump the project all together and move on fixing University.
trouble
How long do you want to ignore this user?
AG
Sub4 said:

BQ_90 said:

How about you fix Welburn and Bush now, then worry about University after its done.

Birdie told me the railroads aren't cooperating too well, and that's the largest reason for the delay.


I am shocked!!!!
doubledog
How long do you want to ignore this user?
Here is something to study: "Fix" Texas Avenue in College Station.
I guess that is not sexy enough for our " BCS Metropolitan Planning Organization"
jello123
How long do you want to ignore this user?
Sub4 said:

BQ_90 said:

How about you fix Welburn and Bush now, then worry about University after its done.

Birdie told me the railroads aren't cooperating too well, and that's the largest reason for the delay.

Quite amazing how RR drag their feet! Here in Lyons where the newly constructed 4-lane FM 60 now intersects 4-lane SH 36 opened 6-months ago. Traffic lights were installed but are not operational due to the RR. Even the Burleson county Sheriff contacted BNSF to try to get a timeline due to the numberous accidents that occur there, yet they continue to blink yellow (Hwy 36) and red (FM 60). Unbelieveable! How difficult could it be???
Aggie_Fire
How long do you want to ignore this user?
AG
doubledog said:

Here is something to study: "Fix" Texas Avenue in College Station.
I guess that is not sexy enough for our " BCS Metropolitan Planning Organization"

What's wrong with Texas Ave? It's one of the major thoroughfares that actually works well
FlyRod
How long do you want to ignore this user?
It did before the medians. Or maybe you were being sarcastic.
PS3D
How long do you want to ignore this user?
Aggie_Fire said:

doubledog said:

Here is something to study: "Fix" Texas Avenue in College Station.
I guess that is not sexy enough for our " BCS Metropolitan Planning Organization"

What's wrong with Texas Ave? It's one of the major thoroughfares that actually works well

It's one of the only major thoroughfares total that doesn't end abruptly mid-way through or has some major design flaw like Wellborn Road's narrowing near F&B Road.

Regardless...how do they address access issues from University Drive to Northgate and TAMU? Even if you built "express lane" tunnels parallel to University Drive it wouldn't be a "plaza" like they want. The only real "alternative" is a megaproject that would bypass Northgate entirely and rip out the residential areas behind it, the houses around Rosemary, and reconnect around Tarrow.

If you really wanted to bury University Drive you should've thought about that 15 years ago before they built buildings close to the road like The Rise or larger buildings behind the main drag.
EBrazosAg
How long do you want to ignore this user?
AG
My point with some major revamp of University from Texas to Welborn would be that the entities that will benefit - TAMU and Northgate within 3/4 miles of it - should foot a larger portion of the bill than folks in North Bryan or Pebble Creek. I could care less about that stretch of University. I probably drive it once every quarter. If TAMU and a bunch of high rise apartments want grade separation- have at it and open your wallet.
No material on this site is intended to be a substitute for professional medical advice, diagnosis or treatment. See full Medical Disclaimer.
Lone Stranger
How long do you want to ignore this user?
Given the timeframe we've seen for the overpass at Wellborn and Bush the 2127 reference above may be a little optimistic...........
75AG
How long do you want to ignore this user?
AG
10 years for a transportation study, 10 years for the environmental impact studies, 10 years of legal challenges, and 5+ years for construction. We'll have flying cars before anything happens on University/FM 60.
Expert Analysis
How long do you want to ignore this user?
AG
BCSMPO has already wasted a bunch of money studying university through campus. Never addressed the Texas/University intersection…. Looks like they are doing the same study again but 5ish years later….

We approved a bond to support the bush Wellborn project and several other projects. Now they delay the bush project. Railroad should be held accountable for costing taxpayers money, time, and reducing safety by not working on these projects in a reasonable time.
doubledog
How long do you want to ignore this user?
Aggie_Fire said:

doubledog said:

Here is something to study: "Fix" Texas Avenue in College Station.
I guess that is not sexy enough for our " BCS Metropolitan Planning Organization"

What's wrong with Texas Ave? It's one of the major thoroughfares that actually works well

At 2818 Texas narrows from six lanes to four lanes. At rush hour the traffic often backs up to Brothers Blvd. Complete the 6 lane to highway 6 with two exits for the frontage road (for now).

Also the Harvey to Holeman stretch needs some attention (e.g. block off Park place and the HEB drives to entrance only from Texas).
Refresh
Page 1 of 1
 
×
subscribe Verify your student status
See Subscription Benefits
Trial only available to users who have never subscribed or participated in a previous trial.