Had a new homeowner in Indian Lakes say that her realtor? builder? told them an access road from Hwy 6 would start construction in June 2015. Can anyone confirm this?
quote:I've seen that plan too, but that looks ten years down the road (so to speak).
I'd be happy if they just widened Arrington Rd
quote:
I hope that they do, it will take so much traffic off my street. Since Indian Lakes opened our street has been the cut through for them.
quote:That original plan may have changed. At least that is what I was told. If it does go through, sure hope we get a DQ on it.
Mesa Verde will continue to the overpass at Texas World Speedway. June 2015 is pretty optimistic though. Probably closer to summer 16 timeframe. The mobile office on Indian Lakes Drive has the detailed information and maps.
quote:I now expect Mesa Verde to come over where my trailer once was. This time next year things will look quite a bit different I'd guess. Neighborhood is a changin.
Anyone know anything else about the time line on extending Mesa Verde to the highway?