My wife and I purchase a home in the DFW area last May, with the intention of renovating the entire thing before moving in. We moved into a crappy temporary apartment, and then got to work. It has been a combination of my sweat and some amazing (and not so amazing) contractors.
We both have day jobs related to real estate and construction, and this is our second house to renovate before moving in.
Here are some progress photos
The house is single story 2400 sf structure built in 1979. 4 beds, 2.5 baths, 2 car garage, with a swimming pool. We actually converted the very small dining room into an office, and made the 1st living area a combination dining/formal living area. The second living area will be our den and wetbar area.
We have movers scheduled on Agust 4th, and we are on schedule to meet that deadline.
A non-inclusive list of on-going projects:
-Scrape popcorn ceilings
-Retexture entire house
-Paint entire house
-New engineered wood floors
-New Baseboards
-New Bathroom Vanities
-Install massive shower in master bath
-New countertops
-New appliances
-New Lighting
-New switches, outlets, etc
We both have day jobs related to real estate and construction, and this is our second house to renovate before moving in.
Here are some progress photos
The house is single story 2400 sf structure built in 1979. 4 beds, 2.5 baths, 2 car garage, with a swimming pool. We actually converted the very small dining room into an office, and made the 1st living area a combination dining/formal living area. The second living area will be our den and wetbar area.
We have movers scheduled on Agust 4th, and we are on schedule to meet that deadline.
A non-inclusive list of on-going projects:
-Scrape popcorn ceilings
-Retexture entire house
-Paint entire house
-New engineered wood floors
-New Baseboards
-New Bathroom Vanities
-Install massive shower in master bath
-New countertops
-New appliances
-New Lighting
-New switches, outlets, etc