I have the ability to run a subpanel upstairs and was considering at least running the wire while I have the studs exposed in my kitchen. I will have an electrician wire it up, but I would like to run the wire before my drywallers close my walls up. I will likely use a 30A switch at the main panel and run romex to the sub panel.
What size romex wire should I use? 12/3 or 10/2?
http://www.cerrowire.com/ampacity-charts
Again I would like to run the wire now, not hook it up yet, but have the option to do so at a later date.
What size romex wire should I use? 12/3 or 10/2?
http://www.cerrowire.com/ampacity-charts
Again I would like to run the wire now, not hook it up yet, but have the option to do so at a later date.