Exxon/Plains All American Wink to Webster Pipeline

8,772 Views | 38 Replies | Last: 4 yr ago by Ribeye-Rare
Stan Crowch
How long do you want to ignore this user?
AG
nm
OnlyForNow
How long do you want to ignore this user?
AG
It was an Exxon pipe? Who was building/designing if not?
Stan Crowch
How long do you want to ignore this user?
AG
Lotus
TwoMarksHand
How long do you want to ignore this user?
AG
I'll see my Plains buddy today and see if he knows anything.
Stan Crowch
How long do you want to ignore this user?
AG
Thanks!
evestor1
How long do you want to ignore this user?
Spread 1 will be built in January (93 miles). Rest is sold to Enterprise.
evestor1
How long do you want to ignore this user?
Talking about pipe.

I have no idea on product or commitments.
Stan Crowch
How long do you want to ignore this user?
AG
evestor1 said:

Spread 1 will be built in January (93 miles). Rest is sold to Enterprise.
Boat Shoes
How long do you want to ignore this user?
AG
Stan Crowch said:

evestor1 said:

Spread 1 will be built in January (93 miles). Rest is sold to Enterprise.
I'm hearing that the entire project has been 86'd as of a few days ago.


That'd be interesting. Any reason given?
DRE06
How long do you want to ignore this user?
AG
Img going to guess that they were just too late. Never want to be the last pipe to deliver. Enterprise, P66, and Epic beat them to market. The pool of shippers were already signed up.
evestor1
How long do you want to ignore this user?
My guess is that PAALP shelved W2W because they bought into Red Oak.
nonameag99
How long do you want to ignore this user?
I would imagine that getting pipeline construction crews is not easy these days.


The Aggie number specified has already been linked with another TexAgs account.
Creek06
How long do you want to ignore this user?
AG
Looks like the overbuild is a true problem. The Permian highway (pipelines by KM, ETC and others) is causing price to transport to drop.

Thinking the Wink to Webster was built with assumptions of over 6 million barrels a day coming from out here now estimates are in the short 5M side.

kcag96
How long do you want to ignore this user?
AG
Anyone have a public source for project shut down?
Furlock Bones
How long do you want to ignore this user?
AG
thought i would bump this back up since the announcement yesterday.

Delek jumped in with $300mm+ to insure this project is a go.

https://www.hydrocarbons-technology.com/news/delek-us-to-acquire-15-interest-in-wink-to-webster-pipeline/
Stan Crowch
How long do you want to ignore this user?
AG
Thanks for sharing Furlock - heard yesterday. Will edit my original post.
DRE06
How long do you want to ignore this user?
AG
I bet that Chevron backed a 3rd pipe for Enterprise out of the Permian to supply the export position they just took to anchor Enterprise's VLCC export terminal.
Ulrich
How long do you want to ignore this user?
DRE06 said:

I bet that Chevron backed a 3rd pipe for Enterprise out of the Permian to supply the export position they just took to anchor Enterprise's VLCC export terminal.

Wasn't that part of the announcement, or did I just assume that?
nonameag99
How long do you want to ignore this user?
Somebody has a whole lot of pipe stacked up on the North side of IH 10 in Junction
Stan Crowch
How long do you want to ignore this user?
AG
Hearing that Red Oak has been cancelled. Anyone have any info on this?
Mas89
How long do you want to ignore this user?
AG
Stan Crowch said:

Hearing that Red Oak has been cancelled. Anyone have any info on this?
The red oak pipeline was supposed to go thru my ranch. On a new path that currently has no pipelines. I just called their rep I have been dealing with and it has been cancelled and he was told today was his last day.
I am much relieved to not have this on my land.
Stan Crowch
How long do you want to ignore this user?
AG
Thanks for the info!
E
How long do you want to ignore this user?
AG
Who was the rep you were working with?
evestor1
How long do you want to ignore this user?
The 20" pipe production started today at the pipe mill after a go /no go decision was made yesterday.


30" is set to start in May...which I doubt will be made.


I have no idea on construction.
Boats and Hose
How long do you want to ignore this user?
AG
Was the rep at Plains or P66?
Bigballin
How long do you want to ignore this user?
AG
Wink to Webster is still going forward. Have no doubt. It will still be a money maker for XOM.
Boats and Hose
How long do you want to ignore this user?
AG
That's a pretty well diversified project if I remember correctly. Meaning there's several owners who have interests in the line. Doubt that gets scrapped.
Stan Crowch
How long do you want to ignore this user?
AG
Im hearing that W2W is cancelled as well. Will share whatever updated info I get.
Boats and Hose
How long do you want to ignore this user?
AG
If true, wow.
evestor1
How long do you want to ignore this user?
I guess that I am confused. Wink 2 Webster is only 3 pipeline spreads since Enterprise took the project. One in Midland that was started 3 weeks ago. Two south of I-10. One of those spreads of 5 miles will be built. The other 25 miles will not.


The previous W2W is called M2e3. It is currently 25% completed of nearly 500 miles. Are you hearing this is being canceled?
Mas89
How long do you want to ignore this user?
AG
Not sure. I never asked. Only said working on the red oak line. They had surveyed and done soil tests where they were going to need to bore. In SE Tx.
Mas89
How long do you want to ignore this user?
AG
Bigballin said:

Wink to Webster is still going forward. Have no doubt. It will still be a money maker for XOM.
A friend in SE Tx also who had the wink to Webster line going thru his farm was told this week that it had been cancelled as well.
74Ag1
How long do you want to ignore this user?
AG
Postponed I would think and not canceled.
BPCAg05
How long do you want to ignore this user?
AG
Plains is handling the construction but P66 will operate.
BPCAg05
How long do you want to ignore this user?
AG
Also heard delay not canceled