Langenator said:
Be nice if they included diagrams, drawings, or something showing what it will look like when it's done.
https://ftp.txdot.gov/pub/txdot/get-involved/bry/fm2818/4-2-19-schematic.pdf
Langenator said:
Be nice if they included diagrams, drawings, or something showing what it will look like when it's done.
^doubledog said:Langenator said:
Be nice if they included diagrams, drawings, or something showing what it will look like when it's done.
https://ftp.txdot.gov/pub/txdot/get-involved/bry/fm2818/4-2-19-schematic.pdf
Approaching the slalom course, err, "Diverging Diamond" from the west, so far only FIVE poles have been knocked down. Easy to observe the damage, while you're waiting for the lights to change, with not a single vehicle coming through (or they are at the other end, also waiting).EBrazosAg said:
It will be slightly less ridiculous and confusing than the diverging diamond bridge..... and appropriately bounded by it to the north.
Yes we will going from 1 stop light (two way) to 4. Now how can that be confusing?Langenator said:
If I'm understanding the drawing correctly, going from one side of 2818 to the other on either Bush or Holleman is going to be convoluted.
Langenator said:
I saw two Constables (not sure what precinct) on 2818 between Stotzer and Bush this morning, running radar.
And the 45 zone extends north to about 100 yds below F&B, FYI.
I agree, but for years, I have read on this forum that the airport refuses to be boxed in on all sides... So, apparently that is a no go...Esteban du Plantier said:
Just extend 47 around the airport to hit Fitch and much of the Holleman backup evaporates.