I have a good friend who has a petroleum engineering degree that is looking for a job. Great guy and extremely hard worker. Any recommendations would be much appreciated!
Sheridan Production Co., Inc. Houston, TX
Production Engineer
Surveilling existing production across a 600+ wellbore field; XSPOC, Zedi, Spotfire Converting lift types to rod pump while increasing production
o Formerly gas lift and ESP lift types changed over to rod pump
o Improved well economics by decreasing LOE & optimizing chemical programs Formulating maintenance and work-over economics on failed wells using ARIES -
production base and wedge, decline curves, and investment
Creating uplift and production increases by stimulating legacy wells
o Pumping pin-point acid jobs on carbonate wells to reinvigorate declining wells
Building well models using Rodstar and XSPOC to complement workover procedures Facilities Engineer
Overseeing Permian Central and Mid-Con surface facilities
Designing upgrades for mature facilities to accommodate horizontal production
Optimizing full field water injection system to maintain efficient water flood sweeping
Sizing test and separation equipment for incoming San Andres production
Brought aged facilities into environmental compliance while adding value to the company Maintaining full field maintenance budget while projecting and accruing for spending
Occidental Petroleum Houston, TX
Facilities Engineer
Collaborated on maintenance capital budget to upgrade surface facilities
Designed commingle project between two leases to reduce operating costs
Sized pumps, production and injection lines, and other various operating equipment Outlined hydraulic modeling simulations based on injection systems
Monthly field trips (Permian basin) to oversee projects and MOC's
Completed Summer 2013 internship: Facilities tank battery consolidation
Completed Summer 2014 internship: Production injector conformance
Sheridan Production Co., Inc. Houston, TX
Production Engineer
Surveilling existing production across a 600+ wellbore field; XSPOC, Zedi, Spotfire Converting lift types to rod pump while increasing production
o Formerly gas lift and ESP lift types changed over to rod pump
o Improved well economics by decreasing LOE & optimizing chemical programs Formulating maintenance and work-over economics on failed wells using ARIES -
production base and wedge, decline curves, and investment
Creating uplift and production increases by stimulating legacy wells
o Pumping pin-point acid jobs on carbonate wells to reinvigorate declining wells
Building well models using Rodstar and XSPOC to complement workover procedures Facilities Engineer
Overseeing Permian Central and Mid-Con surface facilities
Designing upgrades for mature facilities to accommodate horizontal production
Optimizing full field water injection system to maintain efficient water flood sweeping
Sizing test and separation equipment for incoming San Andres production
Brought aged facilities into environmental compliance while adding value to the company Maintaining full field maintenance budget while projecting and accruing for spending
Occidental Petroleum Houston, TX
Facilities Engineer
Collaborated on maintenance capital budget to upgrade surface facilities
Designed commingle project between two leases to reduce operating costs
Sized pumps, production and injection lines, and other various operating equipment Outlined hydraulic modeling simulations based on injection systems
Monthly field trips (Permian basin) to oversee projects and MOC's
Completed Summer 2013 internship: Facilities tank battery consolidation
Completed Summer 2014 internship: Production injector conformance