Portions of 290 look complete. Are those going to be revisited, or are they done with them?
If they are done, then quality of work look sub par. Traffic lines drawn on top of each other, wide gaps between where the new lanes were joined with the old lanes, thin white traffic lines which look like someone was running out of paint, road reflectors missing, construction trash on the side, etc etc.
Doesn't really look First-World-Ish quality work.
If they are done, then quality of work look sub par. Traffic lines drawn on top of each other, wide gaps between where the new lanes were joined with the old lanes, thin white traffic lines which look like someone was running out of paint, road reflectors missing, construction trash on the side, etc etc.
Doesn't really look First-World-Ish quality work.