Won't stop hovering over me and looking at my monitors.
Personal space, bro.
Personal space, bro.
quote:
Start looking at hardcore torture porn. Either he'll get freaked out and go away, or you'll have a buddy for life.
quote:
The company I work for just started a mentor program. So I got nominated to mentor the new engineer who is a UH grad that didn't major in the Power side of electrical engineering but more on the computer side of electrical engineering. So today we go out in the field today because we have a voltage conversion going on going from 15kV to 25kV. So we are driving and I'm explaining some of the framing on our distribution lines and then he proceeds to tell me that the primary conductors are 120/240 voltage. I say uh no they are either 12.5 kV or 24.9 kV. I'm stuck with this guy for a month. I think he needs to spend about 3 months out in the field with the lineman, so they can eat him alive.
quote:quote:
The company I work for just started a mentor program. So I got nominated to mentor the new engineer who is a UH grad that didn't major in the Power side of electrical engineering but more on the computer side of electrical engineering. So today we go out in the field today because we have a voltage conversion going on going from 15kV to 25kV. So we are driving and I'm explaining some of the framing on our distribution lines and then he proceeds to tell me that the primary conductors are 120/240 voltage. I say uh no they are either 12.5 kV or 24.9 kV. I'm stuck with this guy for a month. I think he needs to spend about 3 months out in the field with the lineman, so they can eat him alive.
quote:
I say uh no they are either 12.5 kV or 24.9 kV.
quote:
You don't have your own office?
quote:
Nailed it. Classic BurnetAggie99.
quote:Stop it, I'm getting a chubby.
Today most primary lines are aluminum AAC or aluminum with steel core ACSR. Copper was used in the past for primary conductor but becomes very brittle & soft over time. Today I'm going to attempt to show him system protection & coordination using light table & cyme software. We need to convert all the equipment that's 12.5 kV to 24.9 kV for the voltage conversion.
quote:I simply can't believe this hasn't been made into a sitcom yet.
Today most primary lines are aluminum AAC or aluminum with steel core ACSR. Copper was used in the past for primary conductor but becomes very brittle & soft over time. Today I'm going to attempt to show him system protection & coordination using light table & cyme software. We need to convert all the equipment that's 12.5 kV to 24.9 kV for the voltage conversion.
quote:
OH LOOK AT ME I WORK AT A PLACE THAT CAN AFFORD TO PROVIDE PLACES FOR US TO SIT.
quote:Do you mean light instead of train?
Electrical, train, and orchestra.